ArchyRWS architecture
Menu
Search Archy…

Search Archy

DCIM service

ABBDraftReview not recorded

Work in progress according to its author.

Local drafting workspace

DCIM service

DCIM/dcim-service.md

Local draft — not saved or submitted. Download and use the Git/PR workflow. Changes stay in this page’s memory, never alter the published note, and are lost on reload. The .md download contains the narrative only; preserve the original frontmatter in Git. The preview is not publication validation.

Preview

Images and raw HTML are disabled. Preview links do not navigate. Markdown links are checked when the source is built, not here.

Published source loaded. No local changes.

View source & provenance

Summary

The DCIM service is the curated record of physical infrastructure: which assets exist, where they are, how they are connected and powered, and who is responsible for them. Other work reads it before changing hardware. This building block describes the capability and the minimum that its first consumers need. It does not establish institutional product approval. On 2026-10-17 the proposer confirms that NetBox is consumed from an external service, outside the CLaaS platform. It is expected to enter production "soon", replacing the current legacy OpenDCIM implementation. This is reported service direction, not a confirmed production date, completed migration or verified readiness. The earlier 14 October identification of NetBox for interface records is refined by this scope.

The inventory, intent and observation note sets out the information boundaries: curated inventory, intended configuration and observed state are different records with different authority. This building block builds on those boundaries and does not replace them. That note explains what kind of record inventory is; this one describes the service that holds it and what a consumer can rely on before starting a hardware change.

Capabilities

The first consumers are the datacenter hardware features. The DCM network may also use its interface records, but has no architectural or delivery dependency on this service. For these consumers the service needs to provide:

Capability What consumers rely on
Asset records A stable identity per server, chassis or device, with model, serial number, role, owner and lifecycle state
Location Site, room, rack identity and rack position per asset
Interfaces and connections Network, BMC and power interfaces per asset, and the planned connection for each (switch port, PDU outlet)
Allocations by reference Address and name allocations linked from the address and name authority, not issued independently
Revisions A recorded change history, so a consumer can state which revision it used
Scoped access Read access for named consumers and change access for curators, through the organization's identity controls
Export A consistent snapshot that a change or review can cite

Disks, firmware baselines and support-contract references may be recorded when a consumer needs them. Credentials are never stored in the inventory.

Constraints

Inventory records intent and curated fact. It does not prove that a cable is present or that a server is healthy; observations do that. Each shared field has one writer of record. Where OneView or another management tool also discovers hardware, the two must agree which one is authoritative for each field, and discrepancies are investigated rather than silently overwritten.

Inventory and network details are sensitive. Access follows least privilege; an unrestricted export is not the default.

Service Description

Hardware, network and platform teams use the service to plan and verify changes. Before a hardware change, the consumer checks that the affected assets, interfaces and allocations are recorded and current, and records the revision it used.

The service is a gate on hardware enrolment and firmware work that needs verified inventory. The 2026-10-14 clarification allows BMC identity/setup automation to start after operational DCM access without waiting for DCIM. Inventory is still useful for scope and evidence, but neither that automation nor DCM connectivity depends on this tool. It is not a runtime dependency of running servers, Ceph or OpenShift: an outage blocks the change that consumes its records, not those systems.

Roadmaps

The Phase 1 milestone and its three feature increments are proposed, as requested on 2026-10-17. Capability readiness remains unknown: no service inspection, accepted import results or implementation revisions were supplied. The external provider delivers the service; this plan does not add a NetBox deployment to DCS or another CLaaS cluster. The milestone and all three features are assigned to datacenter, as requested by the proposer. Named delivery owners, actual progress and the production cutover date remain unrecorded.

The first increment is ready when a consumer can read the records for the CLaaS hardware listed in the hardware note, with a named owner for each field and a recorded revision.

NetBox base install

Ensure the external NetBox service is installed and basically configured with authentication. Acceptance demonstrates usable authenticated access for the intended consumers. The identity integration, roles, release and operating handoff remain to confirm; no dependency on the future CLaaS Keycloak service is assumed. The supplied budget is 8 engineering hours / 16 scheduling hours.

NetBox base data model

Define the base data model for Phase 1. It must make the DC 3.0 hardware inventory usable by its consumers, with the asset, location, interface and allocation-reference boundaries described above. Exact fields, required relationships and field owners remain to agree; this is not a new schema implemented by Archy. Acceptance is a documented model usable for the initial import. The supplied budget is 24 engineering hours / 24 scheduling hours. The proposer confirms that this increment starts only after the base install is complete; its delivery prerequisite records that scheduling order explicitly.

Initial DC 3.0 hardware import

Import all hardware for the DC 3.0 setup, not only a sample or the CLaaS subset, into NetBox using the base model. Acceptance reconciles the agreed source inventory against the imported records, with missing or conflicting records resolved or explicitly recorded for acceptance. Exact counts and source/export details remain to supply. This feature requires the base install and base model. The agreed sequence is base install → base data model → initial hardware import. The supplied budget is 8 engineering hours / 16 scheduling hours.

The Phase 1 milestone requires all three features and adds no duplicate work. Total supplied engineering budget: 40 hours. Each feature's scheduling duration is separate from engineering effort, using eight hours per Monday–Friday working day. The sequential features span 56 scheduling hours (seven working days) once their inputs are available. This is a conditional forecast, not a committed delivery date: external availability and import inputs remain unconfirmed. "Soon" is not an earliest-start date or deadline. Stretch goals exist but are deliberately not defined, estimated or added to the roadmap in this increment. No wider OpenDCIM migration, retirement or production-cutover programme is silently included in these three budgets.

Effort scenario: dcim-service

Workstream: Foundations. Phase 1 acceptance milestone; the feature budgets below are counted once.

Work package Low h Working h High h
No additional work beyond the three Phase 1 features 0 0 0

The zero-hour milestone is an accounting convention, not evidence of readiness.

Effort scenario: dcim-service#base-install

Workstream: Foundations. Proposer-supplied point budget, dated 2026-10-17.

Work package Low h Working h High h
Ensure the external NetBox installation, basic configuration and authentication 8 8 8

Duration: 16 scheduling hours. Equal bounds encode the supplied point, not an independent range. Conditional-completion basis and low confidence are retained because the actual remainder and external service readiness are unverified.

Effort scenario: dcim-service#base-model

Workstream: Foundations. Proposer-supplied point budget, dated 2026-10-17.

Work package Low h Working h High h
Define the base data model for the Phase 1 hardware inventory 24 24 24

Duration: 24 scheduling hours. This conditional-completion point has low confidence until the model scope and existing reusable work are confirmed.

Effort scenario: dcim-service#initial-hardware-import

Workstream: Foundations. Proposer-supplied point budget, dated 2026-10-17.

Work package Low h Working h High h
Import and reconcile all DC 3.0 hardware against the base model 8 8 8

Duration: 16 scheduling hours. This conditional-completion point has low confidence until the inventory scope, source data and actual remainder are confirmed. It does not repeat OneView enrolment or firmware work.

Landing Locations

The NetBox offering is external to the CLaaS platform, as reported on 2026-10-17. Its exact hosting location and recovery arrangement are not supplied. The service has to remain available while the platforms it describes are being changed or rebuilt; no CLaaS hosting/bootstrap dependency is introduced.

Available SBBs

No separate NetBox SBB is authored by this increment. The external NetBox offering is the proposer's Phase 1 realization, replacing legacy OpenDCIM. The existing information-boundary note discusses its documented scope as a conceptual reference, not deployment evidence or institutional approval.

Interfaces

A read interface for consumers, a curated change interface for owners, links to the address and name authority, and a snapshot or export interface. Any reconciliation with discovery tools such as HPE OneView is a defined, reviewed flow, not automatic overwriting.

Dependencies

Identity and access control for curators and consumers. Allocation links into the DNS, DHCP and IPAM authority. No dependency on the hardware it describes is recorded: the service must be usable before that hardware is ready.

EIRA Alignment

No EIRA mapping has been established.

Explore this note’s relationships 9 connected notes

Connections are authored references and declared relationships, not verified runtime dependencies or approval.

10 notes · 15 relationships

Every note and relationship is available in the list below. The interactive map requires JavaScript.

Outline is the note kindABBSBBHLDResearchNoteMarkdown referenceTyped relationship
Icon is the documented subjectIdentityNetworkInventoryGeneral note
Notes and relationships Accessible list

Notes (10)

Relationships (15)

Features of this note

3 features declared in this note's metadata. Each is one capability with its own section. Readiness is the author's dated assessment for the scope it names; delivery is the next increment of work. The two are independent, and nothing here combines them across features or implies approval.

  • Initial DC 3.0 hardware import dcim-service#initial-hardware-import

    Readiness
    Readiness unknown for All hardware for the DC 3.0 setup imported into NetBox using the defined base model., no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
    Next delivery
    Proposed, duration 16 working hours (2 working days); datacenter.
    Effort estimate
    8 h working · 8–8 h · Conditional completion; low confidence; assessed 17 Oct 2026. Estimate assumptions
    Roadmaps
    CLaaS — March 2027 roadmap (supporting prerequisite)
  • NetBox base data model dcim-service#base-model

    Readiness
    Readiness unknown for A defined base data model for the Phase 1 DC 3.0 hardware inventory., no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
    Next delivery
    Proposed, duration 24 working hours (3 working days); datacenter.
    Effort estimate
    24 h working · 24–24 h · Conditional completion; low confidence; assessed 17 Oct 2026. Estimate assumptions
    Roadmaps
    CLaaS — March 2027 roadmap (supporting prerequisite)
  • NetBox base install dcim-service#base-install

    Readiness
    Readiness unknown for Externally hosted NetBox installed and basically configured with authentication., no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
    Next delivery
    Proposed, duration 16 working hours (2 working days); datacenter.
    Effort estimate
    8 h working · 8–8 h · Conditional completion; low confidence; assessed 17 Oct 2026. Estimate assumptions
    Roadmaps
    CLaaS — March 2027 roadmap (supporting prerequisite)

Source & provenance

This is the published reading view. The Markdown source and Git review workflow remain authoritative; publication is not architectural approval.

Source
DCIM/dcim-service.md
Identifier
dcim-service
Kind
Architecture building block
Status
Draft, as authored
Revision
a3203210221340f80866b0462f4d63b49ebc5aea

Review not recorded. A recorded review date is the author’s review of the whole note, not an edit date, build date or approval. Editing a local draft does not update it.

Read the Markdown source

Read-only narrative source. Authored labels and relationships are listed above; this view does not write to the vault.


# DCIM service

## Summary

The DCIM service is the curated record of physical infrastructure: which assets
exist, where they are, how they are connected and powered, and who is responsible
for them. Other work reads it before changing hardware. This building block
describes the capability and the minimum that its first consumers need. It does
not establish institutional product approval. On **2026-10-17** the proposer
confirms that **NetBox is consumed from an external service, outside the CLaaS
platform**. It is expected to enter production "soon", replacing the current
legacy **OpenDCIM** implementation. This is reported service direction, not a
confirmed production date, completed migration or verified readiness. The earlier
14 October identification of NetBox for interface records is refined by this scope.

The [inventory, intent and observation note](inventory-intent-and-observed-state.md)
sets out the information boundaries: curated inventory, intended configuration
and observed state are different records with different authority. This building
block builds on those boundaries and does not replace them. That note explains
*what kind of record* inventory is; this one describes the *service* that holds it
and what a consumer can rely on before starting a hardware change.

## Capabilities

The first consumers are the [datacenter hardware features](../Hardware/datacenter-hardware.md).
The [DCM network](../Network/evpn-vxlan.md#dcm-network) may also use its interface
records, but has no architectural or delivery dependency on this service. For
these consumers the service needs to provide:

| Capability | What consumers rely on |
| --- | --- |
| Asset records | A stable identity per server, chassis or device, with model, serial number, role, owner and lifecycle state |
| Location | Site, room, rack identity and rack position per asset |
| Interfaces and connections | Network, BMC and power interfaces per asset, and the planned connection for each (switch port, PDU outlet) |
| Allocations by reference | Address and name allocations linked from the [address and name authority](../Network/dns-dhcp-ipam.md), not issued independently |
| Revisions | A recorded change history, so a consumer can state which revision it used |
| Scoped access | Read access for named consumers and change access for curators, through the organization's [identity](../Identity/federated-authentication.md) controls |
| Export | A consistent snapshot that a change or review can cite |

Disks, firmware baselines and support-contract references may be recorded when a
consumer needs them. Credentials are never stored in the inventory.

## Constraints

Inventory records intent and curated fact. It does not prove that a cable is
present or that a server is healthy; observations do that. Each shared field has
one writer of record. Where OneView or another management tool also discovers
hardware, the two must agree which one is authoritative for each field, and
discrepancies are investigated rather than silently overwritten.

Inventory and network details are sensitive. Access follows least privilege;
an unrestricted export is not the default.

## Service Description

Hardware, network and platform teams use the service to plan and verify changes.
Before a hardware change, the consumer checks that the affected assets, interfaces
and allocations are recorded and current, and records the revision it used.

The service is a gate on hardware enrolment and firmware work that needs verified
inventory. The **2026-10-14** clarification allows BMC identity/setup automation
to start after operational DCM access without waiting for DCIM. Inventory is still
useful for scope and evidence, but neither that automation nor DCM connectivity
depends on this tool. It is not a runtime dependency of running servers, Ceph or
OpenShift: an outage blocks the change that consumes its records, not those systems.

## Roadmaps

The Phase 1 milestone and its three feature increments are **proposed**, as
requested on **2026-10-17**. Capability readiness remains **unknown**: no service
inspection, accepted import results or implementation revisions were supplied.
The external provider delivers the service; this plan does not add a NetBox
deployment to DCS or another CLaaS cluster. The milestone and all three features
are assigned to **datacenter**, as requested by the proposer. Named delivery
owners, actual progress and the production cutover date remain unrecorded.

The first increment is ready when a consumer can read the records for the CLaaS
hardware listed in the [hardware note](../Hardware/datacenter-hardware.md#inventory-specifications-and-rack-layout),
with a named owner for each field and a recorded revision.

### NetBox base install

Ensure the external NetBox service is installed and basically configured with
authentication. Acceptance demonstrates usable authenticated access for the
intended consumers. The identity integration, roles, release and operating handoff
remain to confirm; no dependency on the future CLaaS Keycloak service is assumed.
The supplied budget is **8 engineering hours / 16 scheduling hours**.

### NetBox base data model

Define the base data model for Phase 1. It must make the DC 3.0 hardware inventory
usable by its consumers, with the asset, location, interface and allocation-reference
boundaries described above. Exact fields, required relationships and field owners
remain to agree; this is not a new schema implemented by Archy. Acceptance is a
documented model usable for the initial import. The supplied budget is
**24 engineering hours / 24 scheduling hours**.
The proposer confirms that this increment starts **only after the base install
is complete**; its delivery prerequisite records that scheduling order explicitly.

### Initial DC 3.0 hardware import

Import **all hardware for the DC 3.0 setup**, not only a sample or the CLaaS subset,
into NetBox using the base model. Acceptance reconciles the agreed source inventory
against the imported records, with missing or conflicting records resolved or
explicitly recorded for acceptance. Exact counts and source/export details remain
to supply. This feature requires the base install and base model. The agreed
sequence is **base install → base data model → initial hardware import**.
The supplied budget is **8 engineering hours / 16 scheduling hours**.

The Phase 1 milestone requires all three features and adds no duplicate work.
**Total supplied engineering budget: 40 hours.** Each feature's scheduling duration
is separate from engineering effort, using eight hours per Monday–Friday working
day. The sequential features span **56 scheduling hours (seven working days)**
once their inputs are available. This is a conditional forecast, not a committed
delivery date: external availability and import inputs remain unconfirmed.
"Soon" is not an earliest-start date or deadline.
Stretch goals exist but are deliberately **not defined, estimated or added to
the roadmap** in this increment. No wider OpenDCIM migration, retirement or
production-cutover programme is silently included in these three budgets.

## Effort scenario: dcim-service

**Workstream:** Foundations.
Phase 1 acceptance milestone; the feature budgets below are counted once.

| Work package | Low h | Working h | High h |
| --- | ---: | ---: | ---: |
| No additional work beyond the three Phase 1 features | 0 | 0 | 0 |

The zero-hour milestone is an accounting convention, not evidence of readiness.

## Effort scenario: dcim-service#base-install

**Workstream:** Foundations.
Proposer-supplied point budget, dated **2026-10-17**.

| Work package | Low h | Working h | High h |
| --- | ---: | ---: | ---: |
| Ensure the external NetBox installation, basic configuration and authentication | 8 | 8 | 8 |

**Duration: 16 scheduling hours.** Equal bounds encode the supplied point, not an
independent range. Conditional-completion basis and low confidence are retained
because the actual remainder and external service readiness are unverified.

## Effort scenario: dcim-service#base-model

**Workstream:** Foundations.
Proposer-supplied point budget, dated **2026-10-17**.

| Work package | Low h | Working h | High h |
| --- | ---: | ---: | ---: |
| Define the base data model for the Phase 1 hardware inventory | 24 | 24 | 24 |

**Duration: 24 scheduling hours.** This conditional-completion point has low
confidence until the model scope and existing reusable work are confirmed.

## Effort scenario: dcim-service#initial-hardware-import

**Workstream:** Foundations.
Proposer-supplied point budget, dated **2026-10-17**.

| Work package | Low h | Working h | High h |
| --- | ---: | ---: | ---: |
| Import and reconcile all DC 3.0 hardware against the base model | 8 | 8 | 8 |

**Duration: 16 scheduling hours.** This conditional-completion point has low
confidence until the inventory scope, source data and actual remainder are
confirmed. It does not repeat OneView enrolment or firmware work.

## Landing Locations

The NetBox offering is external to the CLaaS platform, as reported on
**2026-10-17**. Its exact hosting location and recovery arrangement are not supplied.
The service has to remain available while the platforms it describes are being
changed or rebuilt; no CLaaS hosting/bootstrap dependency is introduced.

## Available SBBs

No separate NetBox SBB is authored by this increment. The external NetBox offering
is the proposer's Phase 1 realization, replacing legacy OpenDCIM. The existing
information-boundary note discusses its documented scope as a conceptual reference,
not deployment evidence or institutional approval.

## Interfaces

A read interface for consumers, a curated change interface for owners, links to
the address and name authority, and a snapshot or export interface. Any
reconciliation with discovery tools such as HPE OneView is a defined, reviewed
flow, not automatic overwriting.

## Dependencies

Identity and access control for curators and consumers. Allocation links into
the [DNS, DHCP and IPAM](../Network/dns-dhcp-ipam.md) authority. No dependency on
the hardware it describes is recorded: the service must be usable before that
hardware is ready.

## EIRA Alignment

No EIRA mapping has been established.