DCIM service
Summary
The DCIM service is the curated record of physical infrastructure: which assets exist, where they are, how they are connected and powered, and who is responsible for them. Other work reads it before changing hardware. This building block describes the capability and the minimum that its first consumers need. It does not establish institutional product approval. On 2026-10-17 the proposer confirms that NetBox is consumed from an external service, outside the CLaaS platform. It is expected to enter production "soon", replacing the current legacy OpenDCIM implementation. This is reported service direction, not a confirmed production date, completed migration or verified readiness. The earlier 14 October identification of NetBox for interface records is refined by this scope.
The inventory, intent and observation note sets out the information boundaries: curated inventory, intended configuration and observed state are different records with different authority. This building block builds on those boundaries and does not replace them. That note explains what kind of record inventory is; this one describes the service that holds it and what a consumer can rely on before starting a hardware change.
Capabilities
The first consumers are the datacenter hardware features. The DCM network may also use its interface records, but has no architectural or delivery dependency on this service. For these consumers the service needs to provide:
| Capability | What consumers rely on |
|---|---|
| Asset records | A stable identity per server, chassis or device, with model, serial number, role, owner and lifecycle state |
| Location | Site, room, rack identity and rack position per asset |
| Interfaces and connections | Network, BMC and power interfaces per asset, and the planned connection for each (switch port, PDU outlet) |
| Allocations by reference | Address and name allocations linked from the address and name authority, not issued independently |
| Revisions | A recorded change history, so a consumer can state which revision it used |
| Scoped access | Read access for named consumers and change access for curators, through the organization's identity controls |
| Export | A consistent snapshot that a change or review can cite |
Disks, firmware baselines and support-contract references may be recorded when a consumer needs them. Credentials are never stored in the inventory.
Constraints
Inventory records intent and curated fact. It does not prove that a cable is present or that a server is healthy; observations do that. Each shared field has one writer of record. Where OneView or another management tool also discovers hardware, the two must agree which one is authoritative for each field, and discrepancies are investigated rather than silently overwritten.
Inventory and network details are sensitive. Access follows least privilege; an unrestricted export is not the default.
Service Description
Hardware, network and platform teams use the service to plan and verify changes. Before a hardware change, the consumer checks that the affected assets, interfaces and allocations are recorded and current, and records the revision it used.
The service is a gate on hardware enrolment and firmware work that needs verified inventory. The 2026-10-14 clarification allows BMC identity/setup automation to start after operational DCM access without waiting for DCIM. Inventory is still useful for scope and evidence, but neither that automation nor DCM connectivity depends on this tool. It is not a runtime dependency of running servers, Ceph or OpenShift: an outage blocks the change that consumes its records, not those systems.
Roadmaps
The Phase 1 milestone and its three feature increments are proposed, as requested on 2026-10-17. Capability readiness remains unknown: no service inspection, accepted import results or implementation revisions were supplied. The external provider delivers the service; this plan does not add a NetBox deployment to DCS or another CLaaS cluster. The milestone and all three features are assigned to datacenter, as requested by the proposer. Named delivery owners, actual progress and the production cutover date remain unrecorded.
The first increment is ready when a consumer can read the records for the CLaaS hardware listed in the hardware note, with a named owner for each field and a recorded revision.
NetBox base install
Ensure the external NetBox service is installed and basically configured with authentication. Acceptance demonstrates usable authenticated access for the intended consumers. The identity integration, roles, release and operating handoff remain to confirm; no dependency on the future CLaaS Keycloak service is assumed. The supplied budget is 8 engineering hours / 16 scheduling hours.
NetBox base data model
Define the base data model for Phase 1. It must make the DC 3.0 hardware inventory usable by its consumers, with the asset, location, interface and allocation-reference boundaries described above. Exact fields, required relationships and field owners remain to agree; this is not a new schema implemented by Archy. Acceptance is a documented model usable for the initial import. The supplied budget is 24 engineering hours / 24 scheduling hours. The proposer confirms that this increment starts only after the base install is complete; its delivery prerequisite records that scheduling order explicitly.
Initial DC 3.0 hardware import
Import all hardware for the DC 3.0 setup, not only a sample or the CLaaS subset, into NetBox using the base model. Acceptance reconciles the agreed source inventory against the imported records, with missing or conflicting records resolved or explicitly recorded for acceptance. Exact counts and source/export details remain to supply. This feature requires the base install and base model. The agreed sequence is base install → base data model → initial hardware import. The supplied budget is 8 engineering hours / 16 scheduling hours.
The Phase 1 milestone requires all three features and adds no duplicate work. Total supplied engineering budget: 40 hours. Each feature's scheduling duration is separate from engineering effort, using eight hours per Monday–Friday working day. The sequential features span 56 scheduling hours (seven working days) once their inputs are available. This is a conditional forecast, not a committed delivery date: external availability and import inputs remain unconfirmed. "Soon" is not an earliest-start date or deadline. Stretch goals exist but are deliberately not defined, estimated or added to the roadmap in this increment. No wider OpenDCIM migration, retirement or production-cutover programme is silently included in these three budgets.
Effort scenario: dcim-service
Workstream: Foundations. Phase 1 acceptance milestone; the feature budgets below are counted once.
| Work package | Low h | Working h | High h |
|---|---|---|---|
| No additional work beyond the three Phase 1 features | 0 | 0 | 0 |
The zero-hour milestone is an accounting convention, not evidence of readiness.
Effort scenario: dcim-service#base-install
Workstream: Foundations. Proposer-supplied point budget, dated 2026-10-17.
| Work package | Low h | Working h | High h |
|---|---|---|---|
| Ensure the external NetBox installation, basic configuration and authentication | 8 | 8 | 8 |
Duration: 16 scheduling hours. Equal bounds encode the supplied point, not an independent range. Conditional-completion basis and low confidence are retained because the actual remainder and external service readiness are unverified.
Effort scenario: dcim-service#base-model
Workstream: Foundations. Proposer-supplied point budget, dated 2026-10-17.
| Work package | Low h | Working h | High h |
|---|---|---|---|
| Define the base data model for the Phase 1 hardware inventory | 24 | 24 | 24 |
Duration: 24 scheduling hours. This conditional-completion point has low confidence until the model scope and existing reusable work are confirmed.
Effort scenario: dcim-service#initial-hardware-import
Workstream: Foundations. Proposer-supplied point budget, dated 2026-10-17.
| Work package | Low h | Working h | High h |
|---|---|---|---|
| Import and reconcile all DC 3.0 hardware against the base model | 8 | 8 | 8 |
Duration: 16 scheduling hours. This conditional-completion point has low confidence until the inventory scope, source data and actual remainder are confirmed. It does not repeat OneView enrolment or firmware work.
Landing Locations
The NetBox offering is external to the CLaaS platform, as reported on 2026-10-17. Its exact hosting location and recovery arrangement are not supplied. The service has to remain available while the platforms it describes are being changed or rebuilt; no CLaaS hosting/bootstrap dependency is introduced.
Available SBBs
No separate NetBox SBB is authored by this increment. The external NetBox offering is the proposer's Phase 1 realization, replacing legacy OpenDCIM. The existing information-boundary note discusses its documented scope as a conceptual reference, not deployment evidence or institutional approval.
Interfaces
A read interface for consumers, a curated change interface for owners, links to the address and name authority, and a snapshot or export interface. Any reconciliation with discovery tools such as HPE OneView is a defined, reviewed flow, not automatic overwriting.
Dependencies
Identity and access control for curators and consumers. Allocation links into the DNS, DHCP and IPAM authority. No dependency on the hardware it describes is recorded: the service must be usable before that hardware is ready.
EIRA Alignment
No EIRA mapping has been established.
Explore this note’s relationships 9 connected notes
Connections are authored references and declared relationships, not verified runtime dependencies or approval.
No notes match these filters. Reset filters to show the whole graph.
Drag to pan. Use arrow keys to pan, + / − to zoom, and 0 to fit. Select notes or relationships in the list below for a keyboard alternative.
Every note and relationship is available in the list below. The interactive map requires JavaScript.
Notes and relationships Accessible list
Notes (10)
- CLaaS effort summaryNote · draft · CLaaS. Icon: General note
- CLaaS — March 2027 roadmapNote · draft · CLaaS. Icon: General note
- DCIM serviceABB · draft · DCIM. Icon: Inventory
- HPE OneViewSBB · draft · DCIM. Icon: Inventory
- Inventory and hardware-management control designHLD · draft · DCIM. Icon: Inventory
- Inventory, intended configuration and observed stateNote · draft · DCIM. Icon: Inventory
- Datacenter hardwareNote · draft · Hardware. Icon: General note
- Federated AuthenticationABB · draft · Identity. Icon: Identity
- DNS, DHCP and IP address managementABB · draft · Network. Icon: Network
- EVPN/VXLAN network fabricABB · draft · Network. Icon: Network
Relationships (15)
- DCIM serviceReferences →Inventory, intended configuration and observed stateDCIM/dcim-service.md · Markdown link
- Inventory and hardware-management control designDepends on →DCIM serviceDCIM/inventory-control-design.md · depends_on
- Inventory and hardware-management control designReferences →DCIM serviceDCIM/inventory-control-design.md · Markdown link
- Datacenter hardware
· datacenter-hardware#firmware-managementDepends on →DCIM service· dcim-serviceHardware/datacenter-hardware.md · features.firmware-management.depends_on: dcim-service - Datacenter hardware
· datacenter-hardware#oneview-enrolmentDepends on →DCIM service· dcim-serviceHardware/datacenter-hardware.md · features.oneview-enrolment.depends_on: dcim-service
Features of this note
3 features declared in this note's metadata. Each is one capability with its own section. Readiness is the author's dated assessment for the scope it names; delivery is the next increment of work. The two are independent, and nothing here combines them across features or implies approval.
Initial DC 3.0 hardware import
dcim-service#initial-hardware-import- Readiness
- Readiness unknown for All hardware for the DC 3.0 setup imported into NetBox using the defined base model., no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
- Next delivery
- Proposed, duration 16 working hours (2 working days); datacenter.
- Effort estimate
- 8 h working · 8–8 h · Conditional completion; low confidence; assessed 17 Oct 2026. Estimate assumptions
- Roadmaps
- CLaaS — March 2027 roadmap (supporting prerequisite)
NetBox base data model
dcim-service#base-model- Section
- NetBox base data model
- Readiness
- Readiness unknown for A defined base data model for the Phase 1 DC 3.0 hardware inventory., no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
- Next delivery
- Proposed, duration 24 working hours (3 working days); datacenter.
- Effort estimate
- 24 h working · 24–24 h · Conditional completion; low confidence; assessed 17 Oct 2026. Estimate assumptions
- Roadmaps
- CLaaS — March 2027 roadmap (supporting prerequisite)
NetBox base install
dcim-service#base-install- Section
- NetBox base install
- Readiness
- Readiness unknown for Externally hosted NetBox installed and basically configured with authentication., no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
- Next delivery
- Proposed, duration 16 working hours (2 working days); datacenter.
- Effort estimate
- 8 h working · 8–8 h · Conditional completion; low confidence; assessed 17 Oct 2026. Estimate assumptions
- Roadmaps
- CLaaS — March 2027 roadmap (supporting prerequisite)