HPE OneView

SBBDraftReview not recorded

Work in progress according to its author.

Local drafting workspace

HPE OneView

DCIM/hpe-oneview.md

Local draft — not saved or submitted. Download and use the Git/PR workflow. Changes stay in this page’s memory, never alter the published note, and are lost on reload. The .md download contains the narrative only; preserve the original frontmatter in Git. The preview is not publication validation.

Preview

Images and raw HTML are disabled. Preview links do not navigate. Markdown links are checked when the source is built, not here.

Published source loaded. No local changes.

View source & provenance

HPE OneView is the hardware-management system the proposer has chosen for the DC 3.0 hardware. On 2026-10-17, the proposer confirms an existing setup on the VMware platform, operated by the housing team, on the existing production network. Consuming this installation has no dependency on the new EVPN/VXLAN fabric in Phase 1. This note owns the four Phase 1 delivery increments below. Existing service availability is reported, not independently inspected evidence that its hardware consumers are ready. Version, licensing and support coverage remain unconfirmed.

Service Information

What is known, incorporating the proposer's 2026-10-17 clarification:

Item Information
Product HPE OneView, selected by the proposer
Hosting location Existing VMware platform; exact instance/location not supplied
Service network Existing production network; no new EVPN/VXLAN hosting dependency in Phase 1
Version Not supplied
Availability and access Existing setup reported available; scoped operator access not inspected
Licensing and support coverage Not supplied
Managing party Housing team

This note does not move OneView onto the Datacenter Services Cluster or any other CLaaS platform. It consumes the existing VMware-hosted service. If a future placement is considered, the service must not depend on the hardware or clusters it manages to start, or recovery could deadlock.

Costs and Responsibilities

Costs

No cost or licensing figures have been supplied.

Responsibilities

Managing Party

The housing team operates the existing OneView service. Service operation covers availability, patching, licensing, the vendor support process and access; the actual coverage and named contacts remain to confirm. This does not silently transfer platform-side BMC automation or role-setting design to housing.

Consuming Party

The platform team defines and documents role-optimal settings and owns its BMC identity/setup automation, retaining the 14 October responsibility split. Housing/infra applies and manages Phase 1 profiles and firmware updates. The hardware note retains its stable feature identities as zero-additional-work acceptance milestones referencing these increments, rather than charging the same enrolment/IPMI/firmware work twice.

Roadmap and Lifecycle

Lifecycle

No version or support period has been recorded. Qualify release support for the reported Gen12 role configurations and the remaining per-node inventory; the screenshot is not a support matrix.

Roadmap

The delivery outcome is the four Phase 1 OneView hardware capabilities ready, using the existing service rather than installing a new OneView stack. Service qualification still needs to establish that:

  • the instance is healthy and reachable through its agreed operator-management and recovery access paths;
  • its version supports the server models in the inventory;
  • licences and support connectivity cover the intended servers;
  • named operators have scoped access, with credentials delivered through the organization's secret management and never written into this vault;
  • the service is healthy and its own recovery is understood.

The milestone and all four feature increments are proposed, in datacenter. Current capability readiness remains unknown; no completed provisioning, profile qualification or update results are inferred. The existing service is a reported prerequisite, not a second newly budgeted installation. Missing access, version or entitlement evidence remains a qualification concern, not zero work or a fabricated completion date.

DC 3.0 hardware provisioning

Have all DC 3.0 hardware provisioned in HPE OneView, reconciled with the DCIM inventory. This is hardware enrolment into the existing management service, not OpenShift/OS installation. Record coverage, health exceptions and the licence/support checks described in the hardware enrolment boundary. The supplied budget is 8 engineering hours / 16 scheduling hours, replacing the earlier 32/40-hour enrolment point rather than adding another copy.

IPMI access and configuration

Ensure IPMI access and configuration are complete for the DC 3.0 hardware. Retain the BMC security and automation boundary: permitted management paths succeed, tenant/public paths are denied, identities are scoped and credentials use approved secret delivery, never Git or inventory. This consumes operational DCM access, reported ready on 17 October, without waiting for a future DCM delivery increment, DCIM or the final OneView milestone. The architectural dependency on DCM remains explicit. A conservative earliest_start: 2026-10-17 prevents proposed IPMI work being forecast before that confirmation; it is a planning boundary, not DCM's actual completion date. The supplied budget is 8 engineering hours / 8 scheduling hours, replacing the earlier BMC 8/24-hour point.

DC 3.0 hardware and firmware profiles

Have firmware and configuration profiles for all DC 3.0 hardware, tuning the right settings for each hardware model and role. The platform team defines and documents the settings; housing/infra applies and manages the Phase 1 profiles. Record profile coverage, selected baselines and justified exceptions. A profile's existence is not proof that firmware has been updated or settings applied. The supplied budget is 24 engineering hours / 24 scheduling hours.

DC 3.0 hardware firmware updates

Update firmware for all components of the DC 3.0 hardware to the selected, compatible baselines. Reconcile observed versions and applied settings per node against its profile, record exceptions and qualify staged maintenance without breaking the running services. Retain the role-specific change and single-writer controls. This is not a floating latest-firmware policy or evidence of vendor support. The supplied budget is 16 engineering hours / 16 scheduling hours.

Profiles and updates replace the earlier combined firmware/configuration 16/32-hour budget. The four feature budgets total 56 engineering hours, counted once. They are proposer-supplied completion points; equal low/working/high bounds are not independently assessed ranges or verified remaining work. No current actuals were supplied, so all four use conditional-completion basis with low confidence. The 19 October delivery/racking/patching report does not complete these management increments. Any E810-CQDA2 replacement, procurement wait and resulting requalification remain unestimated outside these budgets; no NIC owner, product or automatic gate on IPMI is inferred.

The dependency order preserves the agreed IPMI/BMC → enrolment → role assessment sequence, then applies updates against those profiles: IPMI configuration → hardware provisioning → hardware profiles → firmware updates. The feature durations sum to 64 scheduling hours (eight working days) after their external prerequisites are available; this is not a committed finish date. On 2026-10-20, the proposer records 64 nodes per datacenter across four racks, with AM4 first in Phase 1: 24 Control, 24 Worker, 8 Ceph and 8 GPU. Those counts define the initial hardware coverage, not per-node budget multipliers. The existing 56 engineering / 64 scheduling-hour points are unchanged and still need reconciliation against actual progress and inventory coverage. DCIM additionally gates provisioning; IPMI consumes the already-ready DCM capability rather than waiting on a pending network task. Neither NetBox nor the DCM network waits for the final OneView milestone, avoiding a bootstrap cycle.

Effort scenario: hpe-oneview

Workstream: Foundations. Phase 1 milestone; all work is counted in the four owning features.

Work package Low h Working h High h
No additional work beyond the four Phase 1 features 0 0 0

Zero is an accounting convention, not a readiness claim.

Effort scenario: hpe-oneview#hardware-provisioning

Workstream: Foundations. Proposer-supplied conditional-completion point, dated 2026-10-17.

Work package Low h Working h High h
Provision and reconcile all DC 3.0 hardware in the existing OneView service 8 8 8

Duration: 16 scheduling hours. Low confidence until coverage and actual remainder are verified. Replaces the earlier hardware-enrolment estimate.

Effort scenario: hpe-oneview#ipmi-configuration

Workstream: Foundations. Proposer-supplied conditional-completion point, dated 2026-10-17.

Work package Low h Working h High h
Complete IPMI access and BMC configuration for the DC 3.0 hardware 8 8 8

Duration: 8 scheduling hours. Low confidence until coverage and actual remainder are verified. Excludes the separately budgeted DCM network work.

Effort scenario: hpe-oneview#hardware-profiles

Workstream: Foundations. Proposer-supplied conditional-completion point, dated 2026-10-17.

Work package Low h Working h High h
Define and make available firmware/configuration profiles for every DC 3.0 hardware role 24 24 24

Duration: 24 scheduling hours. Low confidence until models, role settings and profile coverage are qualified. Does not duplicate firmware rollout.

Effort scenario: hpe-oneview#firmware-updates

Workstream: Foundations. Proposer-supplied conditional-completion point, dated 2026-10-17.

Work package Low h Working h High h
Update all DC 3.0 hardware components and qualify observed firmware/settings 16 16 16

Duration: 16 scheduling hours. Low confidence until the actual remainder and maintenance constraints are verified. Replacing unsupported hardware is not implied.

Architecture

Application Functions

In general terms, OneView manages server hardware through its management interfaces: inventory, health and alerts, configuration through server profiles, and firmware updates. This summary is not checked against version-specific documentation. The 2026-10-14 clarification chooses OneView profiles and firmware updates as the Phase 1 planning route: the platform team defines role-optimal settings and housing/infra applies and manages them in the datacenter domain. Hardware must be enrolled before that assessment. This assigns the consumer workflow; the 2026-10-17 clarification separately names housing as the service operator. Neither statement establishes tested version-specific support. Keep one writer of record for firmware and settings, as set out in the firmware feature.

No ABB for hardware management exists yet, so no realizes is recorded.

Dependencies

The existing VMware-hosted OneView installation runs on the existing production network. Phase 1 consumes it as-is; the service has no architectural dependency on the new EVPN/VXLAN fabric or its DCM feature. No new service-network design or migration is implied by this plan.

This is separate from connectivity to the new DC 3.0 hardware. The IPMI feature retains its architectural dependency on the reported-ready DCM capability, without a future-delivery wait. Delivery requires DCIM and IPMI for provisioning, provisioned hardware for profile definition, then profiles for updates. The aggregate milestone is not a prerequisite for any of its own features. OneView has no CLaaS hosting dependency on DCS, provider bootstrap or the hardware it manages; no migration from VMware is implied.

Technical Architecture

The existing service runs on VMware on the existing production network and is operated by housing, as reported on 2026-10-17. Exact deployment, network paths, access model, release and recovery details remain to document, including reconciliation with the DCIM service.

Technical Documentation

Design Location
HLD Inventory and hardware-management control design (draft)
LLD Not yet authored or linked

Evidence is the proposer's 13/14/17 October planning statements, not an inspection of OneView, VMware, inventory or firmware. No vendor documentation was consulted for this draft; version-specific support and accepted readiness remain unverified.

Explore this note’s relationships 7 connected notes

Connections are authored references and declared relationships, not verified runtime dependencies or approval.

8 notes · 13 relationships

Every note and relationship is available in the list below. The interactive map requires JavaScript.

Outline is the note kindABBSBBHLDResearchNoteMarkdown referenceTyped relationship
Icon is the documented subjectNetworkInventoryPlatformGeneral note
Notes and relationships Accessible list

Notes (8)

Relationships (13)

Features of this note

4 features declared in this note's metadata. Each is one capability with its own section. Readiness is the author's dated assessment for the scope it names; delivery is the next increment of work. The two are independent, and nothing here combines them across features or implies approval.

  • All DC 3.0 hardware firmware updated hpe-oneview#firmware-updates

    Readiness
    Readiness unknown for Firmware updated for the components of all 64 Phase 1 nodes in AM4, with observed versions reconciled to the selected baselines., no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
    Next delivery
    Proposed, duration 16 working hours (2 working days); datacenter; recorded owner Housing/infra team.
    Effort estimate
    16 h working · 16–16 h · Conditional completion; low confidence; assessed 17 Oct 2026. Estimate assumptions
    Roadmaps
    CLaaS — March 2027 roadmap (supporting prerequisite)
  • DC 3.0 hardware and firmware profiles hpe-oneview#hardware-profiles

    Readiness
    Readiness unknown for Firmware and configuration profiles covering the models and roles of all 64 Phase 1 nodes in AM4, with the appropriate role-specific settings., no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
    Next delivery
    Proposed, duration 24 working hours (3 working days); datacenter.
    Effort estimate
    24 h working · 24–24 h · Conditional completion; low confidence; assessed 17 Oct 2026. Estimate assumptions
    Roadmaps
    CLaaS — March 2027 roadmap (supporting prerequisite)
  • DC 3.0 hardware provisioned in OneView hpe-oneview#hardware-provisioning

    Readiness
    Readiness unknown for All 64 Phase 1 nodes in AM4 provisioned in the existing HPE OneView service; per-node identities and accepted coverage remain unconfirmed., no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
    Next delivery
    Proposed, duration 16 working hours (2 working days); datacenter.
    Effort estimate
    8 h working · 8–8 h · Conditional completion; low confidence; assessed 17 Oct 2026. Estimate assumptions
    Roadmaps
    CLaaS — March 2027 roadmap (supporting prerequisite)
  • IPMI access and configuration hpe-oneview#ipmi-configuration

    Readiness
    Readiness unknown for Complete permitted IPMI access and BMC configuration for all 64 Phase 1 nodes in AM4., no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
    Next delivery
    Proposed, duration 8 working hours (1 working day); datacenter; recorded owner Platform team.
    Effort estimate
    8 h working · 8–8 h · Conditional completion; low confidence; assessed 17 Oct 2026. Estimate assumptions
    Roadmaps
    CLaaS — March 2027 roadmap (supporting prerequisite)

Source & provenance

This is the published reading view. The Markdown source and Git review workflow remain authoritative; publication is not architectural approval.

Source
DCIM/hpe-oneview.md
Identifier
hpe-oneview
Kind
Solution building block
Status
Draft, as authored
Revision
a3203210221340f80866b0462f4d63b49ebc5aea

Review not recorded. A recorded review date is the author’s review of the whole note, not an edit date, build date or approval. Editing a local draft does not update it.

Read the Markdown source

Read-only narrative source. Authored labels and relationships are listed above; this view does not write to the vault.


# HPE OneView

HPE OneView is the hardware-management system the proposer has chosen for the
DC 3.0 hardware. On **2026-10-17**, the proposer confirms an **existing setup on
the VMware platform, operated by the housing team**, on the **existing production
network**. Consuming this installation has no dependency on the new EVPN/VXLAN
fabric in Phase 1. This note owns the four
Phase 1 delivery increments below. Existing service availability is reported,
not independently inspected evidence that its hardware consumers are ready.
Version, licensing and support coverage remain unconfirmed.

## Service Information

What is known, incorporating the proposer's **2026-10-17** clarification:

| Item | Information |
| --- | --- |
| Product | HPE OneView, selected by the proposer |
| Hosting location | Existing VMware platform; exact instance/location not supplied |
| Service network | Existing production network; no new EVPN/VXLAN hosting dependency in Phase 1 |
| Version | Not supplied |
| Availability and access | Existing setup reported available; scoped operator access not inspected |
| Licensing and support coverage | Not supplied |
| Managing party | Housing team |

This note does not move OneView onto the [Datacenter Services Cluster](../Platform/datacenter-services-cluster.md)
or any other CLaaS platform. It consumes the existing VMware-hosted service. If a future
placement is considered, the service must not depend on the hardware or clusters
it manages to start, or recovery could deadlock.

### Costs and Responsibilities

#### Costs

No cost or licensing figures have been supplied.

#### Responsibilities

##### Managing Party

The **housing team** operates the existing OneView service. Service operation
covers availability, patching, licensing, the vendor support process and access;
the actual coverage and named contacts remain to confirm. This does not silently
transfer platform-side BMC automation or role-setting design to housing.

##### Consuming Party

The platform team defines and documents role-optimal settings and owns its
BMC identity/setup automation, retaining the 14 October responsibility split.
Housing/infra applies and manages Phase 1 profiles and firmware updates. The
[hardware note](../Hardware/datacenter-hardware.md) retains its stable feature
identities as zero-additional-work acceptance milestones referencing these
increments, rather than charging the same enrolment/IPMI/firmware work twice.

## Roadmap and Lifecycle

### Lifecycle

No version or support period has been recorded. Qualify release support for the
[reported Gen12 role configurations](../Hardware/datacenter-hardware.md#reported-node-role-configurations)
and the remaining per-node inventory; the screenshot is not a support matrix.

### Roadmap

The delivery outcome is **the four Phase 1 OneView hardware capabilities ready**,
using the existing service rather than installing a new OneView stack. Service
qualification still needs to establish that:

- the instance is healthy and reachable through its agreed operator-management
  and recovery access paths;
- its version supports the server models in the inventory;
- licences and support connectivity cover the intended servers;
- named operators have scoped access, with credentials delivered through the
  organization's secret management and never written into this vault;
- the service is healthy and its own recovery is understood.

The milestone and all four feature increments are **proposed**, in **datacenter**.
Current capability readiness remains **unknown**; no completed provisioning,
profile qualification or update results are inferred. The existing service is a
reported prerequisite, not a second newly budgeted installation. Missing access,
version or entitlement evidence remains a qualification concern, not zero work
or a fabricated completion date.

### DC 3.0 hardware provisioning

Have **all DC 3.0 hardware provisioned in HPE OneView**, reconciled with the DCIM
inventory. This is hardware enrolment into the existing management service, not
OpenShift/OS installation. Record coverage, health exceptions and the licence/support
checks described in the [hardware enrolment boundary](../Hardware/datacenter-hardware.md#hpe-oneview-enrolment).
The supplied budget is **8 engineering hours / 16 scheduling hours**, replacing
the earlier 32/40-hour enrolment point rather than adding another copy.

### IPMI access and configuration

Ensure **IPMI access and configuration are complete** for the DC 3.0 hardware.
Retain the [BMC security and automation boundary](../Hardware/datacenter-hardware.md#bmc-management-and-ipmi-access):
permitted management paths succeed, tenant/public paths are denied, identities
are scoped and credentials use approved secret delivery, never Git or inventory.
This consumes operational DCM access, **reported ready on 17 October**, without
waiting for a future DCM delivery increment, DCIM or the final OneView milestone.
The architectural dependency on DCM remains explicit. A conservative
`earliest_start: 2026-10-17` prevents proposed IPMI work being forecast before
that confirmation; it is a planning boundary, **not DCM's actual completion date**.
The supplied budget is **8 engineering hours / 8 scheduling hours**,
replacing the earlier BMC 8/24-hour point.

### DC 3.0 hardware and firmware profiles

Have **firmware and configuration profiles for all DC 3.0 hardware**, tuning the
right settings for each hardware model and role. The platform team defines and
documents the settings; housing/infra applies and manages the Phase 1 profiles.
Record profile coverage, selected baselines and justified exceptions. A profile's
existence is not proof that firmware has been updated or settings applied.
The supplied budget is **24 engineering hours / 24 scheduling hours**.

### DC 3.0 hardware firmware updates

Update **firmware for all components of the DC 3.0 hardware** to the selected,
compatible baselines. Reconcile observed versions and applied settings per node
against its profile, record exceptions and qualify staged maintenance without
breaking the running services. Retain the [role-specific change and single-writer
controls](../Hardware/datacenter-hardware.md#firmware-management-and-role-optimal-configuration).
This is not a floating latest-firmware policy or evidence of vendor support.
The supplied budget is **16 engineering hours / 16 scheduling hours**.

Profiles and updates replace the earlier combined firmware/configuration 16/32-hour
budget. The four feature budgets total **56 engineering hours**, counted once.
They are proposer-supplied completion points; equal low/working/high bounds are
not independently assessed ranges or verified remaining work. No current actuals
were supplied, so all four use conditional-completion basis with low confidence.
The **19 October** delivery/racking/patching report does not complete these
management increments. Any [E810-CQDA2 replacement](../Hardware/datacenter-hardware.md#intel-e810-cqda2-bandwidth-issue),
procurement wait and resulting requalification remain unestimated outside these
budgets; no NIC owner, product or automatic gate on IPMI is inferred.

The dependency order preserves the agreed **IPMI/BMC → enrolment → role assessment**
sequence, then applies updates against those profiles:
**IPMI configuration → hardware provisioning → hardware profiles → firmware updates**.
The feature durations sum to **64 scheduling hours (eight working days)** after
their external prerequisites are available; this is not a committed finish date.
On **2026-10-20**, the proposer records **64 nodes per datacenter across four
racks**, with **AM4** first in Phase 1: 24 Control, 24 Worker, 8 Ceph and 8 GPU.
Those counts define the initial hardware coverage, not per-node budget multipliers.
The existing **56 engineering / 64 scheduling-hour** points are unchanged and still
need reconciliation against actual progress and inventory coverage.
DCIM additionally gates provisioning; IPMI consumes the already-ready DCM
capability rather than waiting on a pending network task. Neither NetBox nor the DCM
network waits for the final OneView milestone, avoiding a bootstrap cycle.

## Effort scenario: hpe-oneview

**Workstream:** Foundations.
Phase 1 milestone; all work is counted in the four owning features.

| Work package | Low h | Working h | High h |
| --- | ---: | ---: | ---: |
| No additional work beyond the four Phase 1 features | 0 | 0 | 0 |

Zero is an accounting convention, not a readiness claim.

## Effort scenario: hpe-oneview#hardware-provisioning

**Workstream:** Foundations.
Proposer-supplied conditional-completion point, dated **2026-10-17**.

| Work package | Low h | Working h | High h |
| --- | ---: | ---: | ---: |
| Provision and reconcile all DC 3.0 hardware in the existing OneView service | 8 | 8 | 8 |

**Duration: 16 scheduling hours.** Low confidence until coverage and actual
remainder are verified. Replaces the earlier hardware-enrolment estimate.

## Effort scenario: hpe-oneview#ipmi-configuration

**Workstream:** Foundations.
Proposer-supplied conditional-completion point, dated **2026-10-17**.

| Work package | Low h | Working h | High h |
| --- | ---: | ---: | ---: |
| Complete IPMI access and BMC configuration for the DC 3.0 hardware | 8 | 8 | 8 |

**Duration: 8 scheduling hours.** Low confidence until coverage and actual
remainder are verified. Excludes the separately budgeted DCM network work.

## Effort scenario: hpe-oneview#hardware-profiles

**Workstream:** Foundations.
Proposer-supplied conditional-completion point, dated **2026-10-17**.

| Work package | Low h | Working h | High h |
| --- | ---: | ---: | ---: |
| Define and make available firmware/configuration profiles for every DC 3.0 hardware role | 24 | 24 | 24 |

**Duration: 24 scheduling hours.** Low confidence until models, role settings and
profile coverage are qualified. Does not duplicate firmware rollout.

## Effort scenario: hpe-oneview#firmware-updates

**Workstream:** Foundations.
Proposer-supplied conditional-completion point, dated **2026-10-17**.

| Work package | Low h | Working h | High h |
| --- | ---: | ---: | ---: |
| Update all DC 3.0 hardware components and qualify observed firmware/settings | 16 | 16 | 16 |

**Duration: 16 scheduling hours.** Low confidence until the actual remainder and
maintenance constraints are verified. Replacing unsupported hardware is not implied.

## Architecture

### Application Functions

In general terms, OneView manages server hardware through its management
interfaces: inventory, health and alerts, configuration through server profiles,
and firmware updates. This summary is not checked against version-specific
documentation. The **2026-10-14** clarification chooses **OneView profiles and
firmware updates as the Phase 1 planning route**: the platform team defines
role-optimal settings and housing/infra applies and manages them in the datacenter
domain. Hardware must be enrolled before that assessment. This assigns the consumer
workflow; the **2026-10-17** clarification separately names housing as the service
operator. Neither statement establishes tested
version-specific support. Keep one writer of record for firmware and settings,
as set out in the [firmware feature](../Hardware/datacenter-hardware.md#firmware-management-and-role-optimal-configuration).

No ABB for hardware management exists yet, so no `realizes` is recorded.

### Dependencies

The **existing VMware-hosted OneView installation runs on the existing production
network**. Phase 1 consumes it as-is; the service has **no architectural dependency
on the new EVPN/VXLAN fabric or its DCM feature**. No new service-network design
or migration is implied by this plan.

This is separate from connectivity to the **new DC 3.0 hardware**. The IPMI feature
retains its architectural dependency on the reported-ready DCM capability, without
a future-delivery wait. Delivery requires DCIM and IPMI for
provisioning, provisioned hardware for profile definition, then profiles for updates.
The aggregate milestone is not a prerequisite for any of its own features.
OneView has no CLaaS hosting dependency on DCS, provider bootstrap or the hardware
it manages; no migration from VMware is implied.

### Technical Architecture

The existing service runs on VMware on the existing production network and is
operated by housing, as reported on
**2026-10-17**. Exact deployment, network paths, access model, release and recovery
details remain to document, including reconciliation with the [DCIM service](dcim-service.md).

### Technical Documentation

| Design | Location |
| --- | --- |
| HLD | [Inventory and hardware-management control design](inventory-control-design.md) (draft) |
| LLD | Not yet authored or linked |

Evidence is the proposer's 13/14/17 October planning statements, not an inspection
of OneView, VMware, inventory or firmware. No vendor documentation was consulted
for this draft; version-specific support and accepted readiness remain unverified.