DCS — Datacenter Services Cluster
Service Information
DCS is one deliverable with independently usable features, not an all-or-nothing service catalogue. It is a bare-metal OpenShift cluster for datacenter-critical services, distinct from tenant control-plane hosting, tenant-worker hosting and fleet management. Consume available organizational services instead of rebuilding them merely because DCS exists.
The fully featured SOLL is broader than this time-bounded project. The first-release workloads remain Keycloak, AAP and platform-content Quay. The proposer mentions NetBox/DCIM, Forgejo and further services as broader candidates, not new March commitments. External GitLab remains the initial operational source; OpenBao remains external, with its DCS migration later. No additional application is inferred.
The 31 March 2027 first-production target and earlier beginning-of-March platform readiness aim remain unchanged. The DCS features do not establish dates or feasibility. The top-level delivery is a zero-additional-work completion milestone over the five features; it does not copy their estimates or assert that DCS is ready.
Roadmap and Lifecycle
Decisions and evidence
The topology and external-first direction originate in the 2026-10-09 assignment. The broader 12 October planning reports say DCS exists in dev, production will be a separate similar build, and substantial cluster setup automation is reusable. The prior DCS range of 36/88/176 h covered a narrower managed-hosting boundary. It is replaced below, not added to the new features.
Three bounded DCS refinement rounds on 2026-10-12, each with five answers, establish the following direction:
- Round 1: one deliverable with consumable features; bare-metal critical-service placement; initial engineer-accessible bootstrap; later bounded team access and ACM import. Ansible initial-cluster provisioning is described; either ACM-led or separate playbook creation remains possible. Initial installation stays bootstrap-owned.
- Round 2: service use requires network/MetalLB/ingress/VIP/VLAN foundations, external RBD, locally configured ExternalDNS/Infoblox, both certificate issuer paths, external-secrets/external OpenBao and namespace governance. An IAM engineer must manage Keycloak namespaces/instances without full-cluster access. Local Virtualization is added. DCS and all its workloads must operate without ACM.
- Round 3: qualified minimal VM hosting, not appliance onboarding; staged engineer-bootstrap to Keycloak-backed team access; both internal and public issuance/renewal qualified before service use; planned DCS host allocation; namespace-policy details unresolved.
User reports above are not deployment evidence. Inspected evidence is the
owning Archy source and PR #9 baseline b49f138, including shared pattern/counting
boundaries. No DCS asset revision, installed release/workload inventory, accepted
test or handover record was supplied or inspected. Identity interruption was
previously reported untested; AAP partial and Quay still to establish. Nothing
here promotes those reports to readiness, dates, spent hours or completion percentages.
Agent inference/proposal: the five feature identities and work packages translate
the agreed capability boundaries into explicit next outcomes. Estimates are engineering
judgement, not measured remainders or team commitments. Both delivery progress and
scoped readiness remain unknown for every feature.
Architecture
The shared OpenShift baseline supplies the fabric,
storage-access and bootstrap contracts. DCS-local features apply and qualify those
contracts without moving shared design into this SBB. Architectural depends_on
describes capability use; delivery.requires names the specific next increment
that must be accepted. A project service-use gate such as local VM capability is
explicitly identified as scope, not falsely described as an application's runtime
dependency. Central management integration cannot become a runtime availability
dependency of this critical cluster.
Hosting foundations
Next outcome: apply the shared baseline to bootstrapped DCS and qualify its local network/exposure and RBD consumer contracts. Installed access alone is an initial bootstrap state, not this service-hosting acceptance.
Observable acceptance: platform engineers can use the intended access path; approved VLANs/VIP pools and MetalLB/ingress expose a representative endpoint over the intended networks without an unapproved management exposure; a representative RBD consumer provisions, writes/reads and retains data through restart/rescheduling. Record the chosen local component/maintenance case, observed access/persistence behaviour and remaining failure thresholds. Numeric availability objectives and exact topology remain unagreed; a successful restart is not a complete resilience claim.
Networking/fabric and common CSI/MetalLB pattern engineering belong to their owners. This feature owns DCS-local rollout and consumer checks. Existing dev setup is a reuse candidate; its exact assets and test coverage remain unknown. Production installation remains bootstrap-owned. The common MetalLB feature avoids gating DCS on the later HCP tenant-ingress demonstration.
RBD is required. S3 is probable for Quay or database backups, but the exact endpoint, scope and consumer contract are not selected. Quay owns its backend configuration; the tenant S3 increment is not automatically its scheduling prerequisite. No DCS CephFS requirement was confirmed. Do not add either unconfirmed interface as a generic DCS gate or infer its completion from the tenant offer.
Service-platform Operators
Next outcome: install/configure the qualified common ExternalDNS, cert-manager and external-secrets patterns locally on DCS, with independently authorized bootstrap identities. This feature does not create DNS, a CA or an OpenBao service.
Observable acceptance: authorized DCS records are created/updated through Infoblox and out-of-scope updates refused; both internal PKI and Let's Encrypt issue and renew approved test identities with observed local consumer adoption/trust; scoped OpenBao values reach only permitted destinations and unauthorized secret references fail. Record the local refresh/issuer/DNS failure handling and operating interfaces. Reuse common support, issuer-isolation and generic failure evidence instead of charging its implementation/tests again. Never put private values in the acceptance record.
Both issuer paths are a deliberate service-use gate even before endpoint mapping is complete. DNS-PERSIST-01 remains the intended public validation method, with no supported end-to-end path yet established by the existing research. Begin with the common go/no-go investigation. No automatic DNS-01 fallback, custom solver or support conclusion is authorized. Unsupported issuance invalidates this implementation scenario; adding hours cannot make it feasible.
Service-team access and governance
Next outcome: provide identity-mapped service-local roles and an explicit namespace governance contract, handing teams only the resources/actions needed for their service.
Observable acceptance: the IAM-engineer role can manage the agreed Keycloak namespaces/instances; it cannot administer the cluster, another team's resources, shared Operators, networking/storage or protected issuer/store configuration. Test direct and relevant controller-mediated permitted/denied actions. Record any necessary cluster-scoped Operator exceptions rather than granting implicit cluster administration.
Namespace-policy details, including required quota/resource/network controls and permitted cross-service paths, are unresolved. The estimate includes bounded supported-policy design, implementation and denial tests, not an assumption that all proposed safeguards were selected. Resolve them before declaring readiness. Namespace names/labels alone do not enforce isolation.
The agreed transition permits authorized platform engineers to install the baseline Operators and Keycloak with namespace guardrails, then activate federated team roles before team handover. Bootstrap does not wait for the IdP it creates. Keep the required platform-engineer MFA and at least two independently usable provider break-glass accounts as existing acceptance obligations; their mechanisms/custody are unverified. Shared IAM design and Keycloak installation remain with their existing owners.
ACM integration and independent operation
Next outcome: import DCS into the ACM hub with explicit configuration ownership and demonstrate the hard runtime requirement against the actual installed workloads.
Observable acceptance: approved enrollment/management works; during authorized qualification of ACM unavailability, the DCS cluster and every installed workload continue their defined operation, including DCS-local access and the selected services' usable contracts. Inventory agents/controllers/policies and check that no critical local operation secretly needs hub availability. Demonstrate reconnect/reconciliation without unintended overwrite of approved local state; identify unresolved change and recovery ownership rather than assume unrestricted local edits are safe.
The test must cover the actual Keycloak, AAP, Quay, baseline Operators and minimal VM capability present in the accepted scope, not just running Pods or one synthetic app. Use the applications' qualified service contracts; add the ACM-disconnection variable, not a second complete application failure/restore campaign. Cross-service recovery ordering remains with coordinated recovery. Additional workloads would require added coverage, not silent acceptance under the same evidence.
ACM hub availability is a delivery prerequisite for import and the test, not a permitted runtime dependency. Import is not required for initial hosting or the engineer-run service bootstrap. An ACM-led first-install route remains an option; select and record that execution route in bootstrap before execution. Whatever route is chosen must preserve the runtime requirement and independent authorized access. No outage or destructive test is run by this documentation work.
Minimal local VM hosting
Next outcome: install/configure supported OpenShift Virtualization locally and qualify one representative synthetic VM on the planned DCS bare-metal allocation.
Observable acceptance: document host/release/entitlement suitability and accepted resource placement; create/start/stop/restart the test VM, validate intended network access and RBD-disk persistence, then demonstrate supported cleanup and the selected host-maintenance/recovery behaviour. No live-migration guarantee is inferred. Test evidence must identify exact versions/configuration and limitations.
This is distinct from the separate tenant-worker Virtualization cluster. Reuse its applicable packaging knowledge/configuration only after review; that service's full delivery outcome is not a DCS gate. DCS-local rollout/VM tests are counted here, not again as tenant-worker work. Existing DCS allocation is intended, not verified capacity or failure headroom. Unsuitable hosts or an unsupported disk/network path require a scope/support decision and re-estimation; procurement is not hidden in these hours. Real appliances, workload onboarding, extra capacity and tenant-hosted VMs remain outside.
Effort scenario: datacenter-services-cluster
Workstream: Platform roles.
| Work package | Low h | Working h | High h |
|---|---|---|---|
| Zero additional work at the DCS milestone; features own all engineering/handover | 0 | 0 | 0 |
High confidence refers only to this no-double-counting convention, not readiness. The five features replace the narrower historical 36/88/176 h range with 119/318/720 h conditional completion, all low confidence. Shared prerequisites and application service hours are excluded, not repeated. No aggregate remaining-work claim, duration, capacity allocation or hours-to-date conversion is made.
The sizing envelope reuses the reported dev DCS for representative qualification and applies the accepted local configuration to the separate production DCS, within the existing project-estate boundary. It does not install another dev estate or multiply hours by an invented host count. Each feature includes its own technical operating evidence/handover; the milestone adds neither a second handover budget nor all-service acceptance hours. If actual topology or rollout needs exceed this bounded envelope, revise the owning work packages before using the range.
Effort scenario: datacenter-services-cluster#hosting
Workstream: Platform roles.
| Work package | Low h | Working h | High h |
|---|---|---|---|
| DCS-local MetalLB/ingress, approved VIP/VLAN inputs and exposure | 8 | 20 | 48 |
| Local RBD classes/credentials and persistent consumer rollout | 6 | 16 | 36 |
| Baseline, representative persistence and chosen local maintenance/failure checks | 8 | 24 | 48 |
| Local hosting evidence and operating interface handover | 4 | 8 | 16 |
Conditional completion 26/68/148 h, low confidence, assessed 2026-10-12. Low assumes applicable setup assets and accepted allocations; working includes local adaptation/rollout and unrun consumer tests; high permits bounded supported exposure, permission/persistence corrections and retests. Shared baseline, fabric, common CSI and MetalLB implementation and initial installations are excluded. New allocation, fabric redesign or unsupported storage/exposure invalidate the scenario rather than becoming an unlimited contingency. No inspected DCS implementation confirms the remainder.
Effort scenario: datacenter-services-cluster#service-platform
Workstream: Platform roles.
| Work package | Low h | Working h | High h |
|---|---|---|---|
| Local ExternalDNS rollout and Infoblox zone/ownership scoping | 4 | 12 | 28 |
| Local cert-manager rollout and both issuer configurations | 6 | 16 | 36 |
| Local external-secrets/OpenBao store and scoped native auth | 4 | 12 | 28 |
| DCS DNS/secret and both-issuer issuance/renewal consumer checks and handover | 10 | 28 | 60 |
Conditional completion 24/68/152 h, low confidence, assessed 2026-10-12. Low assumes usable supported common patterns and approved DCS scopes; working includes local values, deployment, consumer adoption and evidence; high covers bounded local configuration/access corrections and retests. The shared SBBs and certificate ABB retain common implementation and reference trust/renewal qualification; only proving the accepted pattern's local DCS application is here. No new CA, backend service, custom challenge solver or shared-pattern redesign is included. Both supported issuer paths are conditional assumptions, not resolved feasibility. Grant/PKI/DDI/CA waits are separate from the technical investigation already owned by the common patterns.
Effort scenario: datacenter-services-cluster#service-access
Workstream: Platform roles.
| Work package | Low h | Working h | High h |
|---|---|---|---|
| Bounded namespace/Operator/cluster-resource contract and access transition design | 6 | 16 | 36 |
| Implement agreed local RBAC/namespace safeguards and staged engineer access | 6 | 20 | 44 |
| Service-local permitted/denied actions and protected-controller checks | 8 | 20 | 44 |
| Identity-role activation, recovery-access evidence and service-team handover | 4 | 10 | 24 |
Conditional completion 24/66/148 h, low confidence, assessed 2026-10-12. Low assumes applicable local role patterns; working retains unresolved guardrail design and local tests/handover; high allows bounded supported policy/permission corrections. It does not assume quotas/network isolation are already selected or configured. Shared IAM/group/MFA/break-glass design and Keycloak installation stay elsewhere; DCS owns local application/access evidence. A custom admission framework, unbounded Operator exception or inability to enforce team boundaries invalidates the range. Security/IAM approval and receiving-team availability remain unestimated waits.
Effort scenario: datacenter-services-cluster#acm-management
Workstream: Platform roles.
| Work package | Low h | Working h | High h |
|---|---|---|---|
| Actual controller/agent/policy inventory and critical dependency review | 6 | 14 | 32 |
| DCS import, protected local ownership and management configuration | 4 | 10 | 24 |
| All-installed-workloads ACM-independence qualification and findings | 8 | 20 | 44 |
| Safe reconnection/reconciliation evidence and management handover | 4 | 10 | 24 |
Conditional completion 22/54/124 h, low confidence, assessed 2026-10-12. Low assumes applicable import/configuration and usable application contracts; working includes ownership decisions and the unrun disconnection/reconnection qualification; high covers bounded agent/policy corrections and retests. Shared ACM setup, every application's local failure tests, and coordinated recovery implementation are excluded. The hard all-workloads runtime requirement is unchanged in every scenario. A newly discovered critical hub dependency requiring architectural redesign invalidates the range; it is not permission to weaken that requirement. Safe test authority/windows and operations agreement are separate lead time.
Effort scenario: datacenter-services-cluster#virtualization
Workstream: Platform roles.
| Work package | Low h | Working h | High h |
|---|---|---|---|
| Planned DCS host/release/resource/network/RBD suitability review | 6 | 16 | 40 |
| Local supported Operator/configuration adaptation and rollout | 6 | 16 | 40 |
| Synthetic VM lifecycle/network/disk and selected host-maintenance checks | 8 | 22 | 52 |
| VM-hosting evidence and operating boundary handover | 3 | 8 | 16 |
Conditional completion 23/62/148 h, low confidence, assessed 2026-10-12. Low assumes suitable allocated DCS hosts and applicable packaging assets; working includes local setup and representative VM qualification; high permits bounded supported host/attachment/configuration corrections. Shared baseline/CSI work and tenant-worker rollout/remote-HCP qualification remain elsewhere. Real appliance onboarding, extra hosts, host replacement, live-migration promises and unsupported Virtualization paths are excluded. Entitlement, capacity reservation and vendor answers are separate waits/feasibility decisions, not engineering duration.
Sequencing and remaining uncertainty
Can proceed now: inspect reusable DCS/bootstrap/Operator assets and installed revisions; resolve DCS host suitability, VIP/VLAN/storage/issuer scopes and the namespace-policy contract; design the import/ownership and independent access path. These investigations can run in parallel, subject to specialist availability.
Prerequisite order: shared baseline/access contracts and provider bootstrap precede local hosting acceptance; common DNS/certificate/secret patterns and hosting precede local service-platform acceptance. Local minimal Virtualization follows that platform. Engineers can establish Keycloak under staged bootstrap safeguards, then activate identity-mapped team access. AAP/Quay setup may be prepared earlier by authorized engineers, but their accepted DCS service use requires the agreed platform, local VM capability and team-access boundary. Neither waits for final ACM import.
After the platform minimum, Keycloak and local VM qualification can overlap; the complete service-access check consumes both. AAP and Quay service work can then proceed independently. ACM import/ownership design can progress alongside this work; the final independence demonstration follows the real installed-workload contracts. The DCS milestone consumes those feature results without adding hours. Later whole-offering acceptance and coordinated recovery keep their own distinct scope.
Dates remain non-credible until actual reuse/remainders, release/entitlement and host suitability, DNS-PERSIST-01 support, external DNS/PKI/OpenBao grants, namespace controls, workload contracts and operating/test authority are reconciled. Exact host counts, resource headroom, failure thresholds and bootstrap execution route remain open. No DCS owner, support coverage, approval date, specialist allocation, elapsed duration or hours already spent is supplied or invented. DCS operation and recurring support are separate from the engineering ranges; no site-loss continuity or fully populated SOLL catalogue is promised.
Explore this note’s relationships 19 connected notes
Connections are authored references and declared relationships, not verified runtime dependencies or approval.
No notes match these filters. Reset filters to show the whole graph.
Drag to pan. Use arrow keys to pan, + / − to zoom, and 0 to fit. Select notes or relationships in the list below for a keyboard alternative.
Every note and relationship is available in the list below. The interactive map requires JavaScript.
Notes and relationships Accessible list
Notes (20)
- AAP — provisioning orchestration on DCSSBB · draft · Automation. Icon: Automation
- cert-manager — internal and public certificate automationSBB · draft · Certificates. Icon: Certificates
- CLaaS effort assessmentNote · draft · CLaaS. Icon: General note
- CLaaS effort summaryNote · draft · CLaaS. Icon: General note
- CLaaS — Clusters-as-a-Service: first production offeringNote · draft · CLaaS. Icon: General note
- CLaaS platform design — service planes, hosting and failure boundariesHLD · draft · CLaaS. Icon: General note
- CLaaS — March 2027 roadmapNote · draft · CLaaS. Icon: General note
- HPE OneViewSBB · draft · DCIM. Icon: Inventory
- ACM and Global Hub clusterSBB · draft · Fleet. Icon: Fleet
- Keycloak — shared identity providerSBB · draft · Identity. Icon: Identity
- ExternalDNS — provider-managed DNS integrationSBB · draft · Network. Icon: Network
- MetalLB — BGP application entry pointsSBB · draft · Network. Icon: Network
- DCS — Datacenter Services ClusterSBB · draft · Platform. Icon: Platform
- OpenShift platform baselineSBB · draft · Platform. Icon: Platform
- OpenShift hosting and service boundariesNote · draft · Platform. Icon: Platform
- OpenShift Virtualization — tenant worker hostingSBB · draft · Platform. Icon: Platform
- Red Hat Quay service proposalSBB · draft · Registry. Icon: Registry
- External-secrets — platform workload secret deliverySBB · draft · Secrets. Icon: Secrets
- OpenBao — external first, DCS laterSBB · draft · Secrets. Icon: Secrets
- External Ceph through ceph-csiSBB · draft · Storage. Icon: Storage
Relationships (42)
- AAP — provisioning orchestration on DCSDepends on →DCS — Datacenter Services Cluster
· datacenter-services-cluster#service-accessAutomation/ansible-automation-platform.md · depends_on: datacenter-services-cluster#service-access - AAP — provisioning orchestration on DCSDepends on →DCS — Datacenter Services Cluster
· datacenter-services-cluster#service-platformAutomation/ansible-automation-platform.md · depends_on: datacenter-services-cluster#service-platform - AAP — provisioning orchestration on DCSReferences →DCS — Datacenter Services ClusterAutomation/ansible-automation-platform.md · Markdown link
- CLaaS effort assessmentReferences →DCS — Datacenter Services ClusterCLaaS/effort-assessment.md · Markdown link
- CLaaS effort summaryReferences →DCS — Datacenter Services ClusterCLaaS/effort-summary.md · Markdown link
- CLaaS — Clusters-as-a-Service: first production offeringDepends on →DCS — Datacenter Services ClusterCLaaS/index.md · depends_on
- CLaaS — Clusters-as-a-Service: first production offeringReferences →DCS — Datacenter Services ClusterCLaaS/index.md · Markdown link
- CLaaS platform design — service planes, hosting and failure boundariesDescribes →DCS — Datacenter Services ClusterCLaaS/platform-design.md · describes
- CLaaS platform design — service planes, hosting and failure boundariesReferences →DCS — Datacenter Services ClusterCLaaS/platform-design.md · Markdown link
- CLaaS — March 2027 roadmapReferences →DCS — Datacenter Services ClusterCLaaS/roadmap.md · Markdown link
- ACM and Global Hub clusterReferences →DCS — Datacenter Services ClusterFleet/acm-global-hub.md · Markdown link
- Keycloak — shared identity providerDepends on →DCS — Datacenter Services Cluster
· datacenter-services-cluster#service-platformIdentity/keycloak.md · depends_on: datacenter-services-cluster#service-platform - Keycloak — shared identity providerReferences →DCS — Datacenter Services ClusterIdentity/keycloak.md · Markdown link
- MetalLB — BGP application entry pointsReferences →DCS — Datacenter Services ClusterNetwork/metallb-bgp.md · Markdown link
- DCS — Datacenter Services Cluster
· datacenter-services-cluster#acm-managementDepends on →AAP — provisioning orchestration on DCS· ansible-automation-platformPlatform/datacenter-services-cluster.md · features.acm-management.depends_on: ansible-automation-platform - DCS — Datacenter Services Cluster
· datacenter-services-cluster#service-platformDepends on →cert-manager — internal and public certificate automation· cert-managerPlatform/datacenter-services-cluster.md · features.service-platform.depends_on: cert-manager - DCS — Datacenter Services Cluster
· datacenter-services-cluster#acm-managementDepends on →ACM and Global Hub cluster· acm-global-hub#hubPlatform/datacenter-services-cluster.md · features.acm-management.depends_on: acm-global-hub#hub - DCS — Datacenter Services ClusterDepends on →ACM and Global Hub clusterPlatform/datacenter-services-cluster.md · depends_on
- DCS — Datacenter Services Cluster
· datacenter-services-cluster#acm-managementDepends on →Keycloak — shared identity provider· keycloakPlatform/datacenter-services-cluster.md · features.acm-management.depends_on: keycloak - DCS — Datacenter Services Cluster
· datacenter-services-cluster#service-accessDepends on →Keycloak — shared identity provider· keycloakPlatform/datacenter-services-cluster.md · features.service-access.depends_on: keycloak - DCS — Datacenter Services ClusterDepends on →Keycloak — shared identity providerPlatform/datacenter-services-cluster.md · depends_on
- DCS — Datacenter Services Cluster
· datacenter-services-cluster#service-platformDepends on →ExternalDNS — provider-managed DNS integration· external-dnsPlatform/datacenter-services-cluster.md · features.service-platform.depends_on: external-dns - DCS — Datacenter Services Cluster
· datacenter-services-cluster#hostingDepends on →MetalLB — BGP application entry points· metallb-bgp#patternPlatform/datacenter-services-cluster.md · features.hosting.depends_on: metallb-bgp#pattern - DCS — Datacenter Services Cluster
· datacenter-services-cluster#hostingDepends on →OpenShift platform baseline· openshift-platformPlatform/datacenter-services-cluster.md · features.hosting.depends_on: openshift-platform - DCS — Datacenter Services Cluster
· datacenter-services-cluster#virtualizationDepends on →OpenShift platform baseline· openshift-platformPlatform/datacenter-services-cluster.md · features.virtualization.depends_on: openshift-platform - DCS — Datacenter Services ClusterDepends on →OpenShift platform baselinePlatform/datacenter-services-cluster.md · depends_on
- DCS — Datacenter Services Cluster
· datacenter-services-cluster#acm-managementDepends on →Red Hat Quay service proposal· red-hat-quayPlatform/datacenter-services-cluster.md · features.acm-management.depends_on: red-hat-quay - DCS — Datacenter Services Cluster
· datacenter-services-cluster#service-platformDepends on →External-secrets — platform workload secret delivery· external-secretsPlatform/datacenter-services-cluster.md · features.service-platform.depends_on: external-secrets - DCS — Datacenter Services Cluster
· datacenter-services-cluster#service-platformDepends on →OpenBao — external first, DCS later· openbaoPlatform/datacenter-services-cluster.md · features.service-platform.depends_on: openbao - DCS — Datacenter Services ClusterDepends on →OpenBao — external first, DCS laterPlatform/datacenter-services-cluster.md · depends_on
- DCS — Datacenter Services Cluster
· datacenter-services-cluster#hostingDepends on →External Ceph through ceph-csi· external-ceph-csi#rbdPlatform/datacenter-services-cluster.md · features.hosting.depends_on: external-ceph-csi#rbd - DCS — Datacenter Services Cluster
· datacenter-services-cluster#virtualizationDepends on →External Ceph through ceph-csi· external-ceph-csi#rbdPlatform/datacenter-services-cluster.md · features.virtualization.depends_on: external-ceph-csi#rbd - DCS — Datacenter Services ClusterReferences →OpenShift platform baselinePlatform/datacenter-services-cluster.md · Markdown link
- OpenShift platform baselineReferences →DCS — Datacenter Services ClusterPlatform/openshift-platform.md · Markdown link
- OpenShift hosting and service boundariesDepends on →DCS — Datacenter Services ClusterPlatform/openshift-service-boundaries.md · depends_on
- OpenShift hosting and service boundariesReferences →DCS — Datacenter Services ClusterPlatform/openshift-service-boundaries.md · Markdown link
- OpenShift Virtualization — tenant worker hostingReferences →DCS — Datacenter Services ClusterPlatform/openshift-virtualization.md · Markdown link
- Red Hat Quay service proposalDepends on →DCS — Datacenter Services Cluster
· datacenter-services-cluster#service-accessRegistry/red-hat-quay.md · depends_on: datacenter-services-cluster#service-access - Red Hat Quay service proposalDepends on →DCS — Datacenter Services Cluster
· datacenter-services-cluster#service-platformRegistry/red-hat-quay.md · depends_on: datacenter-services-cluster#service-platform - Red Hat Quay service proposalReferences →DCS — Datacenter Services ClusterRegistry/red-hat-quay.md · Markdown link
- OpenBao — external first, DCS laterReferences →DCS — Datacenter Services ClusterSecrets/openbao.md · Markdown link
Features of this note
5 features declared in this note's metadata. Each is one capability with its own section. Readiness is the author's dated assessment for the scope it names; delivery is the next increment of work. The two are independent, and nothing here combines them across features or implies approval.
DCS ACM integration and independent operation
datacenter-services-cluster#acm-management- Readiness
- Readiness unknown for Imported DCS and every installed workload continuing operation during ACM unavailability, no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
- Next delivery
- Unknown: not reconciled in the source, so no dates are forecast.
- Effort estimate
- 54 h working · 22–124 h · Conditional completion; low confidence; assessed 12 Oct 2026. Estimate assumptions
- Depends on
- ACM hub management and governance
acm-global-hub#hub, DCS service-team access and governancedatacenter-services-cluster#service-access, Keycloak — shared identity providerkeycloak, AAP — provisioning orchestration on DCSansible-automation-platform, Red Hat Quay service proposalred-hat-quay - Roadmaps
- CLaaS — March 2027 roadmap (supporting prerequisite)
DCS hosting foundations
datacenter-services-cluster#hosting- Section
- Hosting foundations
- Readiness
- Readiness unknown for DCS bare-metal hosting, exposure and RBD consumers in the project estates, no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
- Next delivery
- Unknown: not reconciled in the source, so no dates are forecast.
- Effort estimate
- 68 h working · 26–148 h · Conditional completion; low confidence; assessed 12 Oct 2026. Estimate assumptions
- Depends on
- OpenShift platform baseline
openshift-platform, RBD block-volume integrationexternal-ceph-csi#rbd, Reusable MetalLB BGP and address-pool patternmetallb-bgp#pattern - Roadmaps
- CLaaS — March 2027 roadmap (supporting prerequisite)
DCS minimal local VM hosting
datacenter-services-cluster#virtualization- Section
- Minimal local VM hosting
- Readiness
- Readiness unknown for Supported local Virtualization with one representative synthetic VM, not appliance onboarding, no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
- Next delivery
- Unknown: not reconciled in the source, so no dates are forecast.
- Effort estimate
- 62 h working · 23–148 h · Conditional completion; low confidence; assessed 12 Oct 2026. Estimate assumptions
- Depends on
- OpenShift platform baseline
openshift-platform, DCS hosting foundationsdatacenter-services-cluster#hosting, RBD block-volume integrationexternal-ceph-csi#rbd - Roadmaps
- CLaaS — March 2027 roadmap (supporting prerequisite)
DCS service-platform Operators
datacenter-services-cluster#service-platform- Section
- Service-platform Operators
- Readiness
- Readiness unknown for DCS-local DNS, both certificate issuers and platform secret-delivery integration, no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
- Next delivery
- Unknown: not reconciled in the source, so no dates are forecast.
- Effort estimate
- 68 h working · 24–152 h · Conditional completion; low confidence; assessed 12 Oct 2026. Estimate assumptions
- Depends on
- DCS hosting foundations
datacenter-services-cluster#hosting, ExternalDNS — provider-managed DNS integrationexternal-dns, cert-manager — internal and public certificate automationcert-manager, External-secrets — platform workload secret deliveryexternal-secrets, OpenBao — external first, DCS lateropenbao - Roadmaps
- CLaaS — March 2027 roadmap (supporting prerequisite)
DCS service-team access and governance
datacenter-services-cluster#service-access- Readiness
- Readiness unknown for Service-team namespace/instance control without full-cluster authority, no assessment date. The author has not been able to say whether this capability is usable for the stated scope.
- Next delivery
- Unknown: not reconciled in the source, so no dates are forecast.
- Effort estimate
- 66 h working · 24–148 h · Conditional completion; low confidence; assessed 12 Oct 2026. Estimate assumptions
- Depends on
- DCS service-platform Operators
datacenter-services-cluster#service-platform, DCS minimal local VM hostingdatacenter-services-cluster#virtualization, Keycloak — shared identity providerkeycloak - Roadmaps
- CLaaS — March 2027 roadmap (supporting prerequisite)