CLaaS — Clusters-as-a-Service: first production offering

DraftReview not recorded

Work in progress according to its author.

Local drafting workspace

CLaaS — Clusters-as-a-Service: first production offering

CLaaS/index.md

Local draft — not saved or submitted. Download and use the Git/PR workflow. Changes stay in this page’s memory, never alter the published note, and are lost on reload. The .md download contains the narrative only; preserve the original frontmatter in Git. The preview is not publication validation.

Preview

Images and raw HTML are disabled. Preview links do not navigate. Markdown links are checked when the source is built, not here.

Published source loaded. No local changes.

View source & provenance

Read the solution architecture

Start with the service boundary below for the first-release intent, then follow the integrated designs. They explain how the building blocks fit together; they do not replace their owning notes, change the delivery estimates, or claim that the proposed platform has passed production acceptance.

Reader question Detailed design
Where do the provider roles, hosted control planes and tenant workers run, and what fails together? Platform solution design
How does an approved request become a cluster, and who owns provisioning, upgrades and retirement? Tenant lifecycle and automation design
How are private management, internal applications, public ingress and external dependencies connected? Network solution design
Where does each class of data live, and what must be restored independently? Storage and recovery design
Which identity or credential crosses each trust boundary, and how is access revoked or recovered? Identity and trust design
How do physical inventory, hardware intent and observed cluster state stay distinct? Inventory and hardware-control design
What must tenant administrators and their controllers be unable to change? Tenant-isolation design
Which SAK requirements apply, where are they allocated, and what evidence is missing? SAK assurance register
Which consequential product claims are documented, uncertain or not yet qualified? Technical-feasibility research

These are connected draft designs, not an approved release or support matrix. In particular, tenant worker networking, the tenant CephFS path, indirect administrator privileges, backup integration and public-certificate validation have explicit qualification or decision obligations. Documentation evidence, an executable acceptance scenario and a successful operational test are different things; the linked designs keep them separate.

Effort scenario: caas-offering

Workstream: Assurance and operations.

Work package Low h Working h High h
Zero additional work at the outcome milestone; work owned by prerequisites 0 0 0

This is a modelling convention, not a completed offering or cost-free acceptance. The prerequisite outcomes own implementation, consumer integration, recovery, retirement and operational/decision evidence. Do not add their hours again here. See the conditional estimate basis and derived component totals. No agreed duration or verified remaining-effort forecast is implied by the zero-hour milestone.

This is a proposal for review, not an approved service catalogue entry or a claim that a platform is deployed. The intended offering gives customers (tenants) their own clusters based on Hosted Control Planes (HCP). CLaaS means Clusters-as-a-Service, reflecting that cluster-delivery scope. This naming change does not alter the agreed service, tenant-workload or authority boundaries. The desired first-production target is 31 March 2027. The consumer, workload class, service objectives, capacity and authorized topology still need to be selected.

The CLaaS roadmap makes this initial scope discussion visible. Its current forecast is intentionally incomplete: prerequisite progress and scheduling durations still need reconciliation. The zero-hour entry on this note is the outcome milestone, not an assertion that creating or accepting the service requires no work.

First-release service boundary

These choices were first recorded on 2026-10-09 and refined through the proposer's clarification rounds. They guide the first-release architecture; they are not institutional approval or evidence of a working service.

Decision First-release position Detail still needed
First production consumer Still to be selected Tenant, workload and measurable business outcome
Initial operating scale A few dozen tenants, each receiving an HCP cluster Reported ambition on 2026-10-12; exact launch batch, growth sequence, profiles and capacity/headroom remain unquantified
Offering variation A small fixed catalogue, differentiated by capacity only Profile sizes and limits; features and service expectations do not vary by profile
Request entry point Existing TOPdesk request and approval workflow Specific request type, approvers and traceable handoff to engineering
Provisioning execution A platform engineer proposes configuration in external GitLab; a reviewed merge to a protected branch activates AAP Exact repository, branch and trigger integration; possible later Forgejo on DCS is not a current dependency
Routine change review A second platform engineer reviews the Git change after TOPdesk approval Reviewer eligibility, checks and enforced branch rules
Automation responsibilities AAP on DCS principally directs provider GitOps/Argo CD on the ACM/Global Hub cluster, and performs external-system provisioning work where needed Exact handoffs, resource ownership, bootstrap and scoped execution identities
Worker capacity after provisioning Fixed for the initial offering Initial allocations and repair/replacement procedures; routine worker resizing and autoscaling are not offered; storage growth is a separate decision
Tenant authority A tailored tenant-admin role with provider-reserved security/admission controls Exact permission set and a supported enforcement boundary tenants cannot bypass
Tenant workload type No tenant-hosted/nested VMs in this CLaaS offering; worker VMs belong to the underlying Virtualization infrastructure Workload eligibility and permitted container capabilities
Tenant cluster upgrades Provider executes; tenant agrees the maintenance timing Supported release policy, notification, security deadlines and escalation
Incident support Coverage still to be agreed Operational owner, response coverage and service commitments; no 24×7 promise is inferred
Production operating team Separate operations team, distinct from the seven-engineer development team Named team/service responsibilities, handover acceptance, skills, tooling, escalation and coverage
Required platform roles ACM/Global Hub, MCE, OpenShift Virtualization and DCS are all required for March Readiness criteria and workload scope for each role
Initial provider bootstrap External engineer-run bootstrap; Agent-based Installer with API VIP for bare-metal clusters, before in-platform AAP/GitOps exist Versioned procedure, execution environment, authorized access and supported VIP/recovery configuration
Bootstrap images Approved external registries before the DCS-hosted Quay service exists Exact approved sources, digests/releases, credentials and controlled access path
Keycloak placement A new Keycloak service on DCS, following initial bootstrap Realm boundaries, upstream federation, operation and supported consumer integration
Human identity source Organizational upstream chosen according to readiness: existing AD-backed federation or IAM's newer Keycloak-based federation Actual service selection, protocol, account/group lifecycle and trust; no commitment to replacing the organizational identity authority
Tenant IAM self-service Manage groups and group memberships for their own clusters; realm topology undecided Supported delegated group administration, role mapping and enforced cross-tenant/provider isolation; no automatic realm-per-tenant decision
Human MFA Required for platform engineers; tenant MFA intended to be opt-in Enforcement, tenant opt-in controls and consistency with applicable organizational requirements
Machine access and secrets Platform secrets in OpenBao; Keycloak when possible, native identities when needed Per-consumer support, scoped credentials, lifecycle and independent bootstrap/recovery access
Emergency administrative access At least two break-glass accounts per provider/platform cluster; tenant-cluster coverage is a stretch goal Mechanism, custody, privileges, activation/audit/rotation and independence from failed identity services
Location resilience Phase 1 starts in AM4; one location with local redundancy Host/rack failure domains, component-failure cases, availability and recovery objectives
Network hardware Existing hardware reported available for reuse Verified inventory, allocation, feature/release support and fabric configuration
Compute hardware Delivered, racked and network patched; 24 Control, 24 Worker, 8 Ceph and 8 GPU nodes per datacenter, across four racks; the same AM4 estate serves development and eventual production targeted for end of Q1 2027 Per-cluster/environment host allocation, concurrency/transition arrangements, per-rack distribution, verified suitability and local failure-domain layout; GPU inventory does not add a GPU service commitment
Tenant storage offer RBD, CephFS and S3 through Ceph RGW on the external Ceph estate Supported modes, endpoint configuration, quotas, credentials and recovery contracts
Tenant workload protection OADP/Velero with the existing organizational Cohesity service as destination Supported adapter/API and data movement; operating responsibilities are not yet decided
Backup service objectives Follow the existing organizational backup policy Exact policy/version, applicable service class, retention, RPO and RTO values; no numeric commitments are inferred
Application exposure Internal and internet-facing applications; reuse existing external NetScaler for the public perimeter Approved routing/security handoff, TLS/inspection responsibilities and publication workflow, separate from private management access
Tenant management access Hosted-cluster APIs and consoles are private-connectivity only Permitted organizational/remote-access paths and enforcement
API and ingress publication MCE's own API retains installer API VIP/keepalived; MetalLB on MCE publishes hosted tenant APIs, and on tenant workers publishes ingress Supported endpoint/recovery configuration and security of fabric presence; alternative management-API research is stretch scope
Network separation Active-active bond/leaf-pair intent with VLAN-separated traffic; current profiles list dual-port 100Gb E810 adapters for Control/Worker/GPU and two single-port 400Gb adapters for Ceph Reported E810 through-card 200 Gbit/s issue and possible replacement; actual modes/rates, supported attachment/failover, VRF interaction, capacity and enforced isolation
Storage quota management Ceph-side management; increases follow the existing organizational storage-service request/approval process Per-tenant mapping, supported enforcement/expansion, exact approvers and completion handoff
Tenant application delivery OpenShift GitOps/Argo CD instance inside each tenant cluster; tenants connect their own organizational GitLab repository Repository-scoped access, protected controller configuration, reconciliation permissions and operating contract
Tenant Argo CD authority Administrative access within their own instance; no central provider Argo CD access or control over platform-managed resources A qualified, non-bypassable ceiling on controller/configuration and reconciliation privileges
Tenant Operators Any Operator authorized within tenant permissions; reject incompatible privileges; curated marketplace restriction is a stretch goal Provider-delivered components remain protected through qualified install/runtime enforcement, not catalogue visibility alone
Tenant retirement Approved complete retirement, including data/backup handling under policy Procedure/tooling, authorization, external-service completion, retention values and evidence
Naming and address management Reuse organizational DNS/IPAM; Infoblox DNS with a tenant-specific subzone and delegated control established during onboarding Exact subzone interface, parent zones/views, backend permissions, pools, owners and access interfaces
ExternalDNS Provider-managed in both provider and tenant clusters Supported Infoblox integration, scoped record authority, ownership and conflict/retirement behaviour
External-secrets Supplied for platform-managed workloads, potentially including tenant provisioning; tenants consume external OpenBao directly Controller deployment locations, platform-only store/credential protection and separate tenant OpenBao contract
Application entry points Provider-managed MetalLB in each tenant cluster peers with EVPN fabric leaf switches using BGP Supported packaging, protected configuration/identities, exact peers, prefix controls, pools and ingress integration
Certificate lifecycle Provider-managed cert-manager in each provider and tenant cluster; existing external OpenBao supplies the intended internal PKI interface, alongside Let's Encrypt Exact Operator, issuing authority/mount/roles, account/domain scope, trust and endpoint mapping
Public certificate validation DNS-PERSIST-01 confirmed as the intended method CA/client support and a qualified implementation; any DNS-01 contingency decided after qualification, not automatically selected
Operational registry Phase 1 Quay: one platform-only instance per datacenter, engineer/cluster access, OpenShift content sync and image scanning Exact content/releases, backend/site readiness and support contract; tenant registry and global upstream are stretch scope
Tenant application images Existing external Harbor is the tentative preferred source Confirm service selection, owner, publishing/pull permissions, image trust and support contract
Workload image trust Existing organizational policy Authoritative requirements/version, admission enforcement and exception process; no assumed signature/scanning threshold
Infrastructure observability Base monitoring stack per cluster; roll-up through ACM multicluster observability to the central ACM/Global Hub cluster Supported components, collection/storage/retention, alert routing and failure handling
Logging OpenShift Logging with Loki for the shared logging capability, including tenant application logs; audit logs may forward to existing external Splunk Collector configuration, placement/storage, platform-log scope, permissions, retention and forwarding guarantees
Tenant observability access Own-cluster health/capacity and workload visibility Enforced tenant isolation across dashboards, query APIs and exports
Tenant runtime egress Reuse organizational egress service and its policy Actual service, permitted destinations/protocols, enforcement and operational handoff
Public application publication Existing organizational NetScaler request/approval process Request interface, executing party, evidence, lead time and completion handoff; no initial appliance automation
Release selection Latest compatible stable releases, qualified together and then pinned Actual supported version matrix, entitlement, lifecycle and controlled upgrades
Qualification environment Separate representative non-production environment; existing four-role dev estate is a reuse candidate Allocation, topology fidelity, safe test boundary, external-service interfaces and readiness evidence
Delivery capacity Dedicated OpenShift development team of seven engineers Effective allocation, availability, specialties and dependencies on other teams; headcount is not seven verified full-time equivalents
Production rollout Separate production build using similar dev configuration and reusable cluster automation Reported on 2026-10-12; actual host counts, revisions, release compatibility and rollout evidence remain open
Internal readiness aim Platform available at the beginning of March, ahead of the fixed 31 March 2027 first-production target Exact internal date and buffer unagreed; December productivity loss and specialist availability must be planned explicitly
Actual implementation progress Working four-role dev estate/HCP deployment and RBD/authentication automation reported on 2026-10-12; initial fabric configuration and static VLANs also reported Reconcile owning outcomes against revisions and test/operating evidence; production readiness and actual dates are not inferred

Tenant administration does not grant administration of the MCE or ACM clusters, the Virtualization infrastructure, DCS, the external Ceph estate or the secrets service. The design must demonstrate that boundary rather than assume that a dedicated cluster name provides it. Provider policy is intended to restrict privileged containers, host networking and host-filesystem access on tenant workers; excluding nested VMs is a different restriction.

The proposer has clarified that a tailored tenant-admin role is acceptable: the initial cluster-admin shorthand is not a promise of the unrestricted Kubernetes role. Security/admission controls may be reserved to the provider. The permission design and bypass-resistant enforcement are still unproven. Do not claim that a policy object or ACM reconciliation supplies that boundary; define it and test it before accepting the service.

An approved TOPdesk request is translated into a platform engineer's proposed Git change. A reviewed merge to a protected branch, not any arbitrary commit, starts the AAP-led provisioning flow. The source is an external GitLab repository, with review by a second platform engineer. The exact repository, branch and integration still need identification; this does not make an Archy documentation merge an infrastructure instruction. No new bespoke request portal is committed by this choice. Support coverage, monitoring, recovery and retirement still need accountable handoffs. Having a cluster does not establish dedicated physical infrastructure or independence from shared failure.

Proposed platform roles

Clarification round 1 on 2026-10-12 identifies existing development progress: the proposer reports Global Hub, MCE, Virtualization and DCS clusters and a working HCP tenant-deployment path using the intended split placement. This was not live inspected; product support, test coverage and production estate status remain open. The intended few-dozen-tenant scale informs capacity and repeatability qualification, not a corresponding number of standalone provider/control-plane installations. Progress details and estimate assumptions stay in the owning component notes.

The assignment now specifies the following building blocks. They describe the intended separation, not observed clusters or an approved release combination.

Building block Role in the proposed offering
OpenShift platform baseline Reusable cluster baseline; every role inherits external Ceph and EVPN/VXLAN
External provider bootstrap Initial provider cluster installations and controlled access, before their in-platform services exist
ACM and Global Hub cluster Central ACM management/governance, with the separate Global Hub hub-of-hubs role
MCE management cluster MCE/HCP management and placement of the tenant control planes
OpenShift Virtualization cluster Separate infrastructure placement for the tenant worker VMs
Hosted control planes Connects control-plane and worker placements into the tenant cluster service
DCS Runs required datacenter-critical services that are not consumed from existing organizational services
Keycloak Common IdP/authentication service on DCS, explicitly in the IAM domain
OpenBao Consume the existing external secrets and intended internal PKI service now; placement on DCS is a future transition
AAP Provisioning orchestration on DCS, with external-system work where needed
Provider GitOps OpenShift GitOps/Argo CD controllers on the central ACM/Global Hub cluster
Operational Git External GitLab desired state initially; Forgejo on DCS is only a possible later alternative
Ceph RGW Tenant S3 object service alongside the RBD/CephFS volume path
MetalLB BGP Provider-operated service-address advertisement and application entry-point integration
Organizational DNS/IPAM Reused naming and allocation services, not replacements built on DCS
Tenant workload protection Platform-provided backup/restore mechanism, distinct from control-plane recovery
Organizational Cohesity Existing destination service to qualify for the OADP/Velero route, not a new DCS deployment
cert-manager Provider-managed per-cluster certificate automation against the selected internal and public issuer paths
Quay on DCS Phase 1: platform-only instance per datacenter, engineer/cluster access, OpenShift content sync and scanning; initial bootstrap remains external. Global upstream and separate CLaaS tenant registry are stretch scope.
Tenant image source Qualify a separate tenant-image contract; existing external Harbor remains a candidate, not a confirmed selection
External NetScaler Reuse the organizational application perimeter; exact handoff to tenant ingress remains to qualify
Observability Per-cluster monitoring, central ACM roll-up, own-cluster tenant visibility and external Splunk audit handoff
Organizational egress Existing external service for tenant runtime outbound traffic, with its policy and consumer contract
Qualification environment Separate representative non-production environment for the acceptance campaign, not a fifth production platform role
Tenant GitOps Tenant-facing application reconciliation and repository onboarding, separate from provider GitOps
ExternalDNS Provider-managed DNS integration for provider and tenant clusters, with tenant subzone setup in Infoblox
External-secrets Platform workload secret-delivery pattern; not an implicit provider-credential bridge for tenant applications

The 2026-10-12 bounded DCS refinement keeps DCS as one deliverable with five source-owned features: hosting foundations, configured service-platform Operators, service-team access/governance, ACM integration with independent operation, and minimal local VM hosting. Its local VM feature is distinct from the tenant-worker Virtualization cluster. DCS and every installed workload must continue operating without ACM. Keycloak, AAP and Quay consume the earlier DCS feature contracts; final DCS management qualification follows the actual installed workloads. Both internal and public issuer paths are required before accepted service use, keeping the unresolved DNS-PERSIST-01 feasibility gate visible. Details and non-overlapping conditional work packages belong in the DCS owning note. NetBox, Forgejo, OpenBao migration and real appliance onboarding are not added to the first-release scope by that refinement.

The central ACM role and Global Hub must not be conflated: Global Hub coordinates ACM hubs, while MCE/HCP components handle hosted-cluster lifecycle. The exact enrollment and supported integration for these separate clusters remains open. Keycloak is now placed on DCS, after the initial externally run bootstrap and before production IAM integration of the provider roles. The common identity direction is now clarified as Keycloak when possible and native identities when needed. It does not prove protocol support, justify unrestricted native credentials or remove the need for independent bootstrap and recovery access.

The general first offering uses one location with local redundancy. The Quay Phase 1 agreement separately requires a platform-only instance per datacenter; second-site hosting and alignment with the March target remain to qualify. Neither scope statement promises continued service after losing the location, nor does it remove backup, recovery or incident-response obligations. Exact failure scenarios, service objectives and the physical location are still to be established.

The expanded application offer does not combine unlike interfaces: ceph-csi provides volume integration, not S3; MetalLB advertises service addresses, not an entire internet security perimeter; and backup tooling does not by itself establish application-consistent or independent recovery. These boundaries remain with their owning notes and acceptance obligations.

First-production prerequisites

The initial roadmap selects a small, provisional set of outcomes, not a complete infrastructure bill of materials. The base is incomplete. Each dependency needs a decision about using an existing service, building a bounded implementation, adopting a controlled transitional arrangement, or deferring it. Unknown does not mean deferred.

  • Hosting and service boundaries must distinguish HCP management, tenant execution and supporting infrastructure. Their first-CLaaS delivery scope must establish actual network, compute, storage, certificate and artifact-supply needs rather than require the whole future base. The expanded HCP and DCS roles now reach the EVPN/VXLAN fabric and external Ceph CSI integration through the shared OpenShift baseline, rather than duplicating their metadata per cluster.
  • Federated authentication must define the relevant tenant and administrative access outcomes against the newly proposed Keycloak SBB. IAM is the assignment's domain for that SBB; no named architect commitment or successful integration is inferred.
  • Coordinated recovery must distinguish management restoration from tenant workload/data recovery and address cold bootstrap without assuming the failed service is available.
  • Production assurance must turn the proposed service promise into explicit criteria, responsibilities and evidence obligations.
  • Tenant retirement must demonstrate an approved complete lifecycle exit without deleting shared services or ignoring retained data/backups.

The frontmatter stores these scheduling prerequisites and short reasons once. The explanations above provide architecture context; ordinary architecture links do not automatically become scheduling prerequisites.

Acceptance and open choices

Round 2 on 2026-10-12 confirms the core seven engineers are dedicated to OpenShift platform work; most platform expertise is covered, but networking is concentrated in one engineer with networking familiarity. Storage and IAM/security/ PKI are in other teams, with additional people available but participation not quantified. December is expected to reduce productivity. Separate production operations still require their own handover and readiness; development dedication does not provide production coverage or verified weekly engineering capacity.

The proposer reports no TOPdesk integration is planned. Round 3 confirms the engineer-mediated manual approval handoff and second-reviewer/protected-merge rule remain required; no bespoke API connector is priced. Enforcement is not yet known. Current commit-triggered dev provisioning is reported progress, not evidence of those production review/authorization controls. A broad reusable provisioning path is reported, AAP/provider GitOps are partial, and Quay still needs establishing.

The assignment proposer owns the proposed acceptance criteria for this iteration. Institutional acceptance authority and participating operational, business and security roles remain to be established. Nothing in this note, roadmap, build or merge records that acceptance has happened.

Before treating the milestone as achieved, record the agreed offering scope and its evidence: a representative tenant lifecycle, applicable isolation and access checks, supported operation/change/recovery paths, service ownership and the assessment of applicable requirements. The exact scenarios and thresholds are still open; this is not a generic compliance checklist.

Evolution without duplicate architecture

Independently meaningful features and their metadata stay inside the architecture note that explains them. Note-level outcomes remain valid for distinct integration work. The body defines scope, completion and the conditional effort breakdown; feature containment does not imply every sibling is a prerequisite. Git preserves history. Do not duplicate the HLD, overwrite completed actuals or count a parent estimate again after splitting it into feature outcomes. A separate note is for a genuinely separate subject, not a requirement of the planning model.

Explore this note’s relationships 48 connected notes

Connections are authored references and declared relationships, not verified runtime dependencies or approval.

49 notes · 72 relationships

Every note and relationship is available in the list below. The interactive map requires JavaScript.

Outline is the note kindABBSBBHLDResearchNoteMarkdown referenceTyped relationship
Icon is the documented subjectRegistryIdentityNetworkStorageCertificatesRecoveryAutomationInventoryFleetPlatformSecretsGeneral note
Notes and relationships Accessible list

Notes (49)

Relationships (72)

Source & provenance

This is the published reading view. The Markdown source and Git review workflow remain authoritative; publication is not architectural approval.

Source
CLaaS/index.md
Identifier
caas-offering
Kind
Note
Status
Draft, as authored
Revision
a3203210221340f80866b0462f4d63b49ebc5aea

Review not recorded. A recorded review date is the author’s review of the whole note, not an edit date, build date or approval. Editing a local draft does not update it.

Read the Markdown source

Read-only narrative source. Authored labels and relationships are listed above; this view does not write to the vault.


# CLaaS — Clusters-as-a-Service: first production offering

## Read the solution architecture

Start with the service boundary below for the first-release intent, then follow
the integrated designs. They explain how the building blocks fit together;
they do not replace their owning notes, change the delivery estimates, or claim
that the proposed platform has passed production acceptance.

| Reader question | Detailed design |
| --- | --- |
| Where do the provider roles, hosted control planes and tenant workers run, and what fails together? | [Platform solution design](platform-design.md) |
| How does an approved request become a cluster, and who owns provisioning, upgrades and retirement? | [Tenant lifecycle and automation design](../Automation/tenant-lifecycle-design.md) |
| How are private management, internal applications, public ingress and external dependencies connected? | [Network solution design](../Network/claas-network-design.md) |
| Where does each class of data live, and what must be restored independently? | [Storage and recovery design](../Storage/storage-recovery-design.md) |
| Which identity or credential crosses each trust boundary, and how is access revoked or recovered? | [Identity and trust design](../Identity/identity-trust-design.md) |
| How do physical inventory, hardware intent and observed cluster state stay distinct? | [Inventory and hardware-control design](../DCIM/inventory-control-design.md) |
| What must tenant administrators and their controllers be unable to change? | [Tenant-isolation design](../Security/tenant-isolation.md) |
| Which SAK requirements apply, where are they allocated, and what evidence is missing? | [SAK assurance register](../Security/sak-assurance.md) |
| Which consequential product claims are documented, uncertain or not yet qualified? | [Technical-feasibility research](technical-feasibility.md) |

These are connected **draft designs**, not an approved release or support matrix.
In particular, tenant worker networking, the tenant CephFS path, indirect
administrator privileges, backup integration and public-certificate validation
have explicit qualification or decision obligations. Documentation evidence,
an executable acceptance scenario and a successful operational test are different
things; the linked designs keep them separate.

## Effort scenario: caas-offering

**Workstream:** Assurance and operations.

| Work package | Low h | Working h | High h |
| --- | ---: | ---: | ---: |
| Zero additional work at the outcome milestone; work owned by prerequisites | 0 | 0 | 0 |

This is a modelling convention, not a completed offering or cost-free acceptance.
The prerequisite outcomes own implementation, consumer integration, recovery,
retirement and operational/decision evidence. Do not add their hours again here.
See the [conditional estimate basis](effort-assessment.md) and
[derived component totals](effort-summary.md). No agreed duration or verified
remaining-effort forecast is implied by the zero-hour milestone.

This is a **proposal for review**, not an approved service catalogue entry or a
claim that a platform is deployed. The intended offering gives customers
(tenants) their own clusters based on Hosted Control Planes (HCP). CLaaS means
**Clusters-as-a-Service**, reflecting that cluster-delivery scope. This naming
change does not alter the agreed service, tenant-workload or authority boundaries.
The desired
first-production target is **31 March 2027**. The consumer, workload class,
service objectives, capacity and authorized topology still need to be selected.

The [CLaaS roadmap](roadmap.md) makes this initial scope discussion visible.
Its current forecast is intentionally incomplete: prerequisite progress and
scheduling durations still need reconciliation. The zero-hour entry on this note is the **outcome milestone**, not
an assertion that creating or accepting the service requires no work.

## First-release service boundary

These choices were first recorded on **2026-10-09** and refined through the
proposer's clarification rounds. They guide the first-release architecture;
they are not institutional approval or evidence of a working service.

| Decision | First-release position | Detail still needed |
| --- | --- | --- |
| First production consumer | Still to be selected | Tenant, workload and measurable business outcome |
| Initial operating scale | A few dozen tenants, each receiving an HCP cluster | Reported ambition on 2026-10-12; exact launch batch, growth sequence, profiles and capacity/headroom remain unquantified |
| Offering variation | A small fixed catalogue, differentiated by capacity only | Profile sizes and limits; features and service expectations do not vary by profile |
| Request entry point | Existing TOPdesk request and approval workflow | Specific request type, approvers and traceable handoff to engineering |
| Provisioning execution | A platform engineer proposes configuration in external GitLab; a reviewed merge to a protected branch activates AAP | Exact repository, branch and trigger integration; possible later Forgejo on DCS is not a current dependency |
| Routine change review | A second platform engineer reviews the Git change after TOPdesk approval | Reviewer eligibility, checks and enforced branch rules |
| Automation responsibilities | AAP on DCS principally directs provider GitOps/Argo CD on the ACM/Global Hub cluster, and performs external-system provisioning work where needed | Exact handoffs, resource ownership, bootstrap and scoped execution identities |
| Worker capacity after provisioning | Fixed for the initial offering | Initial allocations and repair/replacement procedures; routine worker resizing and autoscaling are not offered; storage growth is a separate decision |
| Tenant authority | A tailored tenant-admin role with provider-reserved security/admission controls | Exact permission set and a supported enforcement boundary tenants cannot bypass |
| Tenant workload type | No tenant-hosted/nested VMs in this CLaaS offering; worker VMs belong to the underlying Virtualization infrastructure | Workload eligibility and permitted container capabilities |
| Tenant cluster upgrades | Provider executes; tenant agrees the maintenance timing | Supported release policy, notification, security deadlines and escalation |
| Incident support | Coverage still to be agreed | Operational owner, response coverage and service commitments; no 24×7 promise is inferred |
| Production operating team | Separate operations team, distinct from the seven-engineer development team | Named team/service responsibilities, handover acceptance, skills, tooling, escalation and coverage |
| Required platform roles | ACM/Global Hub, MCE, OpenShift Virtualization and DCS are all required for March | Readiness criteria and workload scope for each role |
| Initial provider bootstrap | External engineer-run bootstrap; Agent-based Installer with API VIP for bare-metal clusters, before in-platform AAP/GitOps exist | Versioned procedure, execution environment, authorized access and supported VIP/recovery configuration |
| Bootstrap images | Approved external registries before the DCS-hosted Quay service exists | Exact approved sources, digests/releases, credentials and controlled access path |
| Keycloak placement | A new Keycloak service on DCS, following initial bootstrap | Realm boundaries, upstream federation, operation and supported consumer integration |
| Human identity source | Organizational upstream chosen according to readiness: existing AD-backed federation or IAM's newer Keycloak-based federation | Actual service selection, protocol, account/group lifecycle and trust; no commitment to replacing the organizational identity authority |
| Tenant IAM self-service | Manage groups and group memberships for their own clusters; realm topology undecided | Supported delegated group administration, role mapping and enforced cross-tenant/provider isolation; no automatic realm-per-tenant decision |
| Human MFA | Required for platform engineers; tenant MFA intended to be opt-in | Enforcement, tenant opt-in controls and consistency with applicable organizational requirements |
| Machine access and secrets | Platform secrets in OpenBao; Keycloak when possible, native identities when needed | Per-consumer support, scoped credentials, lifecycle and independent bootstrap/recovery access |
| Emergency administrative access | At least two break-glass accounts per provider/platform cluster; tenant-cluster coverage is a stretch goal | Mechanism, custody, privileges, activation/audit/rotation and independence from failed identity services |
| Location resilience | Phase 1 starts in AM4; one location with local redundancy | Host/rack failure domains, component-failure cases, availability and recovery objectives |
| Network hardware | Existing hardware reported available for reuse | Verified inventory, allocation, feature/release support and fabric configuration |
| Compute hardware | Delivered, racked and network patched; 24 Control, 24 Worker, 8 Ceph and 8 GPU nodes per datacenter, across four racks; the same AM4 estate serves development and eventual production targeted for end of Q1 2027 | Per-cluster/environment host allocation, concurrency/transition arrangements, per-rack distribution, verified suitability and local failure-domain layout; GPU inventory does not add a GPU service commitment |
| Tenant storage offer | RBD, CephFS and S3 through Ceph RGW on the external Ceph estate | Supported modes, endpoint configuration, quotas, credentials and recovery contracts |
| Tenant workload protection | OADP/Velero with the existing organizational Cohesity service as destination | Supported adapter/API and data movement; operating responsibilities are not yet decided |
| Backup service objectives | Follow the existing organizational backup policy | Exact policy/version, applicable service class, retention, RPO and RTO values; no numeric commitments are inferred |
| Application exposure | Internal and internet-facing applications; reuse existing external NetScaler for the public perimeter | Approved routing/security handoff, TLS/inspection responsibilities and publication workflow, separate from private management access |
| Tenant management access | Hosted-cluster APIs and consoles are private-connectivity only | Permitted organizational/remote-access paths and enforcement |
| API and ingress publication | MCE's own API retains installer API VIP/keepalived; MetalLB on MCE publishes hosted tenant APIs, and on tenant workers publishes ingress | Supported endpoint/recovery configuration and security of fabric presence; alternative management-API research is stretch scope |
| Network separation | Active-active bond/leaf-pair intent with VLAN-separated traffic; current profiles list dual-port 100Gb E810 adapters for Control/Worker/GPU and two single-port 400Gb adapters for Ceph | Reported E810 through-card 200 Gbit/s issue and possible replacement; actual modes/rates, supported attachment/failover, VRF interaction, capacity and enforced isolation |
| Storage quota management | Ceph-side management; increases follow the existing organizational storage-service request/approval process | Per-tenant mapping, supported enforcement/expansion, exact approvers and completion handoff |
| Tenant application delivery | OpenShift GitOps/Argo CD instance inside each tenant cluster; tenants connect their own organizational GitLab repository | Repository-scoped access, protected controller configuration, reconciliation permissions and operating contract |
| Tenant Argo CD authority | Administrative access within their own instance; no central provider Argo CD access or control over platform-managed resources | A qualified, non-bypassable ceiling on controller/configuration and reconciliation privileges |
| Tenant Operators | Any Operator authorized within tenant permissions; reject incompatible privileges; curated marketplace restriction is a stretch goal | Provider-delivered components remain protected through qualified install/runtime enforcement, not catalogue visibility alone |
| Tenant retirement | Approved complete retirement, including data/backup handling under policy | Procedure/tooling, authorization, external-service completion, retention values and evidence |
| Naming and address management | Reuse organizational DNS/IPAM; Infoblox DNS with a tenant-specific subzone and delegated control established during onboarding | Exact subzone interface, parent zones/views, backend permissions, pools, owners and access interfaces |
| ExternalDNS | Provider-managed in both provider and tenant clusters | Supported Infoblox integration, scoped record authority, ownership and conflict/retirement behaviour |
| External-secrets | Supplied for platform-managed workloads, potentially including tenant provisioning; tenants consume external OpenBao directly | Controller deployment locations, platform-only store/credential protection and separate tenant OpenBao contract |
| Application entry points | Provider-managed MetalLB in each tenant cluster peers with EVPN fabric leaf switches using BGP | Supported packaging, protected configuration/identities, exact peers, prefix controls, pools and ingress integration |
| Certificate lifecycle | Provider-managed cert-manager in each provider and tenant cluster; existing external OpenBao supplies the intended internal PKI interface, alongside Let's Encrypt | Exact Operator, issuing authority/mount/roles, account/domain scope, trust and endpoint mapping |
| Public certificate validation | DNS-PERSIST-01 confirmed as the intended method | CA/client support and a qualified implementation; any DNS-01 contingency decided after qualification, not automatically selected |
| Operational registry | Phase 1 Quay: one platform-only instance per datacenter, engineer/cluster access, OpenShift content sync and image scanning | Exact content/releases, backend/site readiness and support contract; tenant registry and global upstream are stretch scope |
| Tenant application images | Existing external Harbor is the tentative preferred source | Confirm service selection, owner, publishing/pull permissions, image trust and support contract |
| Workload image trust | Existing organizational policy | Authoritative requirements/version, admission enforcement and exception process; no assumed signature/scanning threshold |
| Infrastructure observability | Base monitoring stack per cluster; roll-up through ACM multicluster observability to the central ACM/Global Hub cluster | Supported components, collection/storage/retention, alert routing and failure handling |
| Logging | OpenShift Logging with Loki for the shared logging capability, including tenant application logs; audit logs may forward to existing external Splunk | Collector configuration, placement/storage, platform-log scope, permissions, retention and forwarding guarantees |
| Tenant observability access | Own-cluster health/capacity and workload visibility | Enforced tenant isolation across dashboards, query APIs and exports |
| Tenant runtime egress | Reuse organizational egress service and its policy | Actual service, permitted destinations/protocols, enforcement and operational handoff |
| Public application publication | Existing organizational NetScaler request/approval process | Request interface, executing party, evidence, lead time and completion handoff; no initial appliance automation |
| Release selection | Latest compatible stable releases, qualified together and then pinned | Actual supported version matrix, entitlement, lifecycle and controlled upgrades |
| Qualification environment | Separate representative non-production environment; existing four-role dev estate is a reuse candidate | Allocation, topology fidelity, safe test boundary, external-service interfaces and readiness evidence |
| Delivery capacity | Dedicated OpenShift development team of seven engineers | Effective allocation, availability, specialties and dependencies on other teams; headcount is not seven verified full-time equivalents |
| Production rollout | Separate production build using similar dev configuration and reusable cluster automation | Reported on 2026-10-12; actual host counts, revisions, release compatibility and rollout evidence remain open |
| Internal readiness aim | Platform available at the beginning of March, ahead of the fixed 31 March 2027 first-production target | Exact internal date and buffer unagreed; December productivity loss and specialist availability must be planned explicitly |
| Actual implementation progress | Working four-role dev estate/HCP deployment and RBD/authentication automation reported on 2026-10-12; initial fabric configuration and static VLANs also reported | Reconcile owning outcomes against revisions and test/operating evidence; production readiness and actual dates are not inferred |

Tenant administration does not grant administration of the MCE or
ACM clusters, the Virtualization infrastructure, DCS, the external Ceph estate
or the secrets service. The design must demonstrate that boundary rather than
assume that a dedicated cluster name provides it. Provider policy is intended to
restrict privileged containers, host networking and host-filesystem access on
tenant workers; excluding nested VMs is a different restriction.

The proposer has clarified that a **tailored tenant-admin role** is acceptable:
the initial cluster-admin shorthand is not a promise of the unrestricted
Kubernetes role. Security/admission controls may be reserved to the provider.
The permission design and bypass-resistant enforcement are still unproven. Do
not claim that a policy object or ACM reconciliation supplies that boundary;
define it and test it before accepting the service.

An approved TOPdesk request is translated into a platform engineer's proposed Git
change. A **reviewed merge to a protected branch**, not any arbitrary commit,
starts [the AAP-led provisioning flow](../Automation/intent-to-runtime.md#first-claas-delivery-scope).
The source is an [external GitLab repository](../Automation/operational-git.md),
with review by a second platform engineer. The exact repository, branch and
integration still need identification;
this does not make an Archy documentation merge an infrastructure instruction.
No new bespoke request portal is committed by this choice. Support coverage,
monitoring, recovery and retirement still need accountable handoffs. Having a
cluster does not establish dedicated physical infrastructure or independence
from shared failure.

## Proposed platform roles

Clarification round 1 on **2026-10-12** identifies existing development progress:
the proposer reports Global Hub, MCE, Virtualization and DCS clusters and a working
HCP tenant-deployment path using the intended split placement. This was not live
inspected; product support, test coverage and production estate status remain open.
The intended few-dozen-tenant scale informs capacity and repeatability qualification,
not a corresponding number of standalone provider/control-plane installations.
Progress details and estimate assumptions stay in the owning component notes.

The assignment now specifies the following building blocks. They describe the
intended separation, not observed clusters or an approved release combination.

| Building block | Role in the proposed offering |
| --- | --- |
| [OpenShift platform baseline](../Platform/openshift-platform.md) | Reusable cluster baseline; every role inherits external Ceph and EVPN/VXLAN |
| [External provider bootstrap](../Platform/provider-bootstrap.md) | Initial provider cluster installations and controlled access, before their in-platform services exist |
| [ACM and Global Hub cluster](../Fleet/acm-global-hub.md) | Central ACM management/governance, with the separate Global Hub hub-of-hubs role |
| [MCE management cluster](../Fleet/mce-management-cluster.md) | MCE/HCP management and placement of the tenant control planes |
| [OpenShift Virtualization cluster](../Platform/openshift-virtualization.md) | Separate infrastructure placement for the tenant worker VMs |
| [Hosted control planes](../Platform/hosted-control-planes.md) | Connects control-plane and worker placements into the tenant cluster service |
| [DCS](../Platform/datacenter-services-cluster.md) | Runs required datacenter-critical services that are not consumed from existing organizational services |
| [Keycloak](../Identity/keycloak.md) | Common IdP/authentication service on DCS, explicitly in the IAM domain |
| [OpenBao](../Secrets/openbao.md) | Consume the existing external secrets and intended internal PKI service now; placement on DCS is a future transition |
| [AAP](../Automation/ansible-automation-platform.md) | Provisioning orchestration on DCS, with external-system work where needed |
| [Provider GitOps](../Automation/openshift-gitops.md) | OpenShift GitOps/Argo CD controllers on the central ACM/Global Hub cluster |
| [Operational Git](../Automation/operational-git.md) | External GitLab desired state initially; Forgejo on DCS is only a possible later alternative |
| [Ceph RGW](../Storage/tenant-object-storage.md) | Tenant S3 object service alongside the RBD/CephFS volume path |
| [MetalLB BGP](../Network/metallb-bgp.md) | Provider-operated service-address advertisement and application entry-point integration |
| [Organizational DNS/IPAM](../Network/dns-dhcp-ipam.md) | Reused naming and allocation services, not replacements built on DCS |
| [Tenant workload protection](../Recovery/tenant-workload-protection.md) | Platform-provided backup/restore mechanism, distinct from control-plane recovery |
| [Organizational Cohesity](../Recovery/cohesity-backup-service.md) | Existing destination service to qualify for the OADP/Velero route, not a new DCS deployment |
| [cert-manager](../Certificates/cert-manager.md) | Provider-managed per-cluster certificate automation against the selected internal and public issuer paths |
| [Quay on DCS](../Registry/red-hat-quay.md#phase-1-feature-set) | Phase 1: platform-only instance per datacenter, engineer/cluster access, OpenShift content sync and scanning; initial bootstrap remains external. Global upstream and separate CLaaS tenant registry are stretch scope. |
| [Tenant image source](../Registry/tenant-image-source.md) | Qualify a separate tenant-image contract; existing external Harbor remains a candidate, not a confirmed selection |
| [External NetScaler](../Network/external-netscaler.md) | Reuse the organizational application perimeter; exact handoff to tenant ingress remains to qualify |
| [Observability](../Observability/platform-observability.md) | Per-cluster monitoring, central ACM roll-up, own-cluster tenant visibility and external Splunk audit handoff |
| [Organizational egress](../Network/organizational-egress.md) | Existing external service for tenant runtime outbound traffic, with its policy and consumer contract |
| [Qualification environment](../Platform/qualification-environment.md) | Separate representative non-production environment for the acceptance campaign, not a fifth production platform role |
| [Tenant GitOps](../Automation/tenant-gitops.md) | Tenant-facing application reconciliation and repository onboarding, separate from provider GitOps |
| [ExternalDNS](../Network/external-dns.md) | Provider-managed DNS integration for provider and tenant clusters, with tenant subzone setup in Infoblox |
| [External-secrets](../Secrets/external-secrets.md) | Platform workload secret-delivery pattern; not an implicit provider-credential bridge for tenant applications |

The **2026-10-12 bounded DCS refinement** keeps DCS as one deliverable with five
source-owned features: hosting foundations, configured service-platform Operators,
service-team access/governance, ACM integration with independent operation, and
minimal local VM hosting. Its local VM feature is distinct from the tenant-worker
Virtualization cluster. DCS and every installed workload must continue operating
without ACM. Keycloak, AAP and Quay consume the earlier DCS feature contracts;
final DCS management qualification follows the actual installed workloads. Both
internal and public issuer paths are required before accepted service use, keeping
the unresolved DNS-PERSIST-01 feasibility gate visible. Details and non-overlapping
conditional work packages belong in the [DCS owning note](../Platform/datacenter-services-cluster.md).
NetBox, Forgejo, OpenBao migration and real appliance onboarding are not added to
the first-release scope by that refinement.

The central ACM role and Global Hub must not be conflated: Global Hub coordinates
ACM hubs, while MCE/HCP components handle hosted-cluster lifecycle. The exact
enrollment and supported integration for these separate clusters remains open.
Keycloak is now placed on DCS, after the initial externally run bootstrap and
before production IAM integration of the provider roles. The common identity
direction is now clarified as Keycloak when possible and native identities when
needed. It does not prove protocol support, justify unrestricted native credentials
or remove the need for independent bootstrap and recovery access.

The general first offering uses one location with local redundancy. The
[Quay Phase 1 agreement](../Registry/red-hat-quay.md#phase-1-feature-set) separately
requires a platform-only instance per datacenter; second-site hosting and alignment
with the March target remain to qualify. Neither scope statement promises
continued service after losing the location, nor does it remove backup, recovery
or incident-response obligations. Exact failure scenarios, service objectives and
the physical location are still to be established.

The expanded application offer does not combine unlike interfaces: ceph-csi
provides volume integration, not S3; MetalLB advertises service addresses, not
an entire internet security perimeter; and backup tooling does not by itself
establish application-consistent or independent recovery. These boundaries remain
with their owning notes and acceptance obligations.

## First-production prerequisites

The initial roadmap selects a **small, provisional set of outcomes**, not a
complete infrastructure bill of materials. The base is incomplete. Each
dependency needs a decision about using an existing service, building a bounded
implementation, adopting a controlled transitional arrangement, or deferring it.
Unknown does not mean deferred.

- [Hosting and service boundaries](../Platform/openshift-service-boundaries.md)
  must distinguish HCP management, tenant execution and supporting infrastructure.
  Their first-CLaaS delivery scope must establish actual network, compute, storage,
  certificate and artifact-supply needs rather than require the whole future base.
  The expanded HCP and DCS roles now reach the
  [EVPN/VXLAN fabric](../Network/evpn-vxlan.md) and
  [external Ceph CSI integration](../Storage/external-ceph-csi.md) through the
  shared OpenShift baseline, rather than duplicating their metadata per cluster.
- [Federated authentication](../Identity/federated-authentication.md) must define
  the relevant tenant and administrative access outcomes against the newly
  proposed Keycloak SBB. IAM is the assignment's domain for that SBB; no named
  architect commitment or successful integration is inferred.
- [Coordinated recovery](../Recovery/coordinated-recovery.md) must distinguish
  management restoration from tenant workload/data recovery and address cold
  bootstrap without assuming the failed service is available.
- [Production assurance](production-assurance.md) must turn the proposed service
  promise into explicit criteria, responsibilities and evidence obligations.
- [Tenant retirement](tenant-retirement.md) must demonstrate an approved complete
  lifecycle exit without deleting shared services or ignoring retained data/backups.

The frontmatter stores these scheduling prerequisites and short reasons once.
The explanations above provide architecture context; ordinary architecture links
do not automatically become scheduling prerequisites.

## Acceptance and open choices

Round 2 on **2026-10-12** confirms the core seven engineers are dedicated to
OpenShift platform work; most platform expertise is covered, but networking is
concentrated in one engineer with networking familiarity. Storage and IAM/security/
PKI are in other teams, with additional people available but participation not
quantified. December is expected to reduce productivity. Separate production
operations still require their own handover and readiness; development dedication
does not provide production coverage or verified weekly engineering capacity.

The proposer reports no TOPdesk integration is planned. Round 3 confirms the
engineer-mediated manual approval handoff and second-reviewer/protected-merge rule
remain required; no bespoke API connector is priced. Enforcement is not yet known.
Current commit-triggered dev provisioning is reported progress, not evidence of
those production review/authorization controls. A broad reusable provisioning path
is reported, AAP/provider GitOps are partial, and Quay still needs establishing.

The assignment proposer owns the **proposed** acceptance criteria for this
iteration. Institutional acceptance authority and participating operational,
business and security roles remain to be established. Nothing in this note,
roadmap, build or merge records that acceptance has happened.

Before treating the milestone as achieved, record the agreed offering scope and
its evidence: a representative tenant lifecycle, applicable isolation and access
checks, supported operation/change/recovery paths, service ownership and the
assessment of applicable requirements. The exact scenarios and thresholds are
still open; this is not a generic compliance checklist.

## Evolution without duplicate architecture

Independently meaningful features and their metadata stay inside the architecture
note that explains them. Note-level outcomes remain valid for distinct integration
work. The body defines scope, completion and the conditional effort breakdown;
feature containment does not imply every sibling is a prerequisite. Git preserves
history. Do not duplicate the HLD, overwrite completed actuals or count a parent
estimate again after splitting it into feature outcomes. A separate note is for a
genuinely separate subject, not a requirement of the planning model.